Jump to content

Project Thread/New Construction/Photo du jour/Const. CAMs


smeagolsfree

Recommended Posts


Thanks so much for the pics, Ron.  They are great for folks like me who don't live in Nash and can't check out the progress so easily. 

 

Question about the Fairfield:  I looked on Google for where it is being built and compared with this photo.  I thought it would replace the storage place, but apprently it Is it taking only the space of something called "Mature Essensuals" (hmmm!).  I can see the back of the storage place on the right of your photo.  So am I correct that the storage place remains open for business... and that weird looking building with the balcony that fronts along Division? 

 

Thanks again... I really enjoy those photos.

Link to comment
Share on other sites

 

 

The question was brought up Saturday about what projects we think will start in the next few months.The projects listed below are what I think will start soon. I do feel like we are going to have some surprises and may have a few projects announced and start in a short time period. I also think we are going to have some big announcements coming this year for SURE.

 

Proposed & close to starting

 

-HG Hill apartment project on 21st & Blair

 

HillsboroVillageHGHillproject.png

 

Hill20Two.png

 

Hill20Four.png

 

-New 5 story apartment building on Rolling Mill Hill

(rendering to be released soon /Baker Barrios is the architect) No rendering

available yet.

 

-Hilton Garden Inn on Peabody

and 3rd

 

HiltonGardenInn_zpsaab7feb9.jpg

 

HG3rdpeabody_zpsec555c02.png

 

-Ray Hensler 12th and Laurel (scheduled to start

before end of 2012 /23 story tower)

 

Hensler_rendering_092112_zpse26e2d7e.jpg

 

-West End Summit

 

Old rendering:

 

imagesCAM2J7ZU.jpg

 

Updated rendering being the HQ of Parallon Business Solutions & Sarah Cannon Research

Institute.

 

West20End20Summit20New.jpg

 

-Apartments at

Main & McFerrin DBL A development

 

mcferrinmain.png

 

-Luxus Germantown

5th and Monroe (land has been purchased)

 

http://www.luxusgermantown.com/

 

-ONEC1TY/ First building scheduled to start 2nd

qtr. of 2013 with second building to start soon afterwards. OneCityNashville.jpg

 

-Buckingham

Project on 21st

 

buckingham.png

 

buckinghawm4.jpg

 

%7Boption%7Dhttp://i24.photobucket.com/albums/c22/smeagolsfree/buckingham1

 

-Westmont Apartments demolition and rebuild (5 story build

out)

 

Westmont.png

 

(Residents must be out in March 2013)

 

 

 

Link to comment
Share on other sites

What's with the second Buckingham picture?  The original rendering was full of architectural details, French balconies, bay windows, etc.  The second is a faceless mass of stucco and flat, undetailed windows and looks like a housing project from the 1960s.  This could go from being my favorite project to being a definite non-favorite.

Edited by Neigeville
  • Like 1
Link to comment
Share on other sites

  • 2 weeks later...

Doing a new list for you all and this is a massive list. I wll have to do it in several post. This blasted list changes almost everyday. Again if interested all projects can be found on development map.

 

 

 

Recently Finished

 

 

 

- Astoria (in Bedford
Commons in Green Hills)

 

-Centennial
Hospital 6 story addition
and build out of Sarah Cannon Ctr.

 

-East River
Place

 

EastRiverplace.jpg

 

-Bell
Midtown

 

BDMIDTOWN.jpg

 

-Germantown Vista

 

Vista_Germantown_472.jpg

 

-Midtown Place

 

Midtownplace.jpg

 

-Home 2 suites on Broadway -complete 2012

 

Home220Suites1_280.jpg

 

-Park 30 -opened and
converted to apartments
2012

 

30North.jpg

 

-Bruin Hall @ Belmont
-complete 2012

 

BruinHallBelmont.jpg

 

358.jpg

 

-Belmont School of Law- complete 2012

 

350.jpg

 

-Gatewood Workforce Housing- complete 2013

 

gatewood2.jpg

 

-Greyhound Bus Terminal -complete 2012

 

Greyhound.jpg

 

-Cumberland
Park

 

cumberlandpark.jpg

 

-Bridge
Building rehab

 

NabriCo.jpg

 

492.jpg

 

-28th
Ave extension -open Oct.2012

 

http://www.nashville.gov/pw/projects/28th_31st_AvenueConnectorProject.asp

 

-11 North

 

11north.jpg

 

-700 Wedgewood -complete 2013

 

700Wedgewood.png

 

214_zpsdd6b495e.jpg

 

-Nursing home expansion on Wedgewood -complete 2013

 

DSC_0212_zps67d31cd3.jpg

 

-Note 16 - complete 2013

 

16thHorton.jpg

 

-3rd and Chestnut- complete 2012

 

3rbChestnut_zps88b48275.jpg



Going to do this in muliple post. List is massive and changing almost every day.





 

Under Construction



 

-Music
City Center
(opens May 2013)



 

ccwomni.jpg



 

-Omni Hotel



 

omni2.jpg



 

-Country
Music Hall of Fame
expansion

 

Artist-Rendering-of-Country-Music-HOF-1_



 

-Hyatt Place



 

hyatt-nashvilleLG.jpg



 

-Trolley Barn Rehab (partially completed)



 

trolley.jpg



 

-Elliston 23



 

elliston.jpg



 

-Home Wood Suites on West End



 

16931552_BG4_zpsdf5296c7.jpg



 

-Kissam Hall



 

Kissam-wide1.jpg



 

-Park Central



 

Screen20Shot202012-08-3020at2010_45_0920



 

-West End
Village



 

WEVillage_zps3d34125a.jpg



 

342.jpg



 

-Project on Long BLVD, Coventry Place



 

341.jpg



 

-Wedgewood academic building @ Belmont



 

wedgewoodacedimic1_zps43c44515.png



 

Screen20Shot202012-05-0420at2011_53_1820



 

-Vanderbilt build out of one of the medical center
buildings/ always something going on here and cant keep track of all of it



 

-Vanderbilt Indoor Practice facility



 

new-rec-center-fi_zpse4da40b9.jpg



 

-Pine Street Lofts



 

pine-street-flats-the-gulch-400x259.jpg



 

-Ryman Lofts



 

rymanlofts.png



 

-The Square @ 4th



 

untitled.png



 

-12 South



 

1220South20Lofts20Rendering20jpeg_900.jp



 

12southflats.jpg



 

-Lentz
Health Center



 

lentz_zps12d37dc2.jpg



 

-Parking Garage at Nashville City
Center. 5 stories of
under ground parking built to support a 20 story tower at a later time.



 

NCCParkigngarage.png



 

-Village Row @ Wedgewood and 17th



 

VillageRow1.png



 

-Korean Veterans extension and new roundabout



 

367.jpg



 

-Chesterfield
Ave Project



 

thechesterfield-052512_Page_3_zps6b0d460



 

-Meharry college Turner center



 

TURNER_CENTER_CORNER20photo_zps10b7bd93.



 

TurnerCenter2.png



 

-Project in Salem town @ Garfield and 5th



 

025.jpg



 

5thGarfieldTownhomessmall-7501.jpg



 

-Melrose
apartments, 214 unit, 30 million dollar project on Franklin Pike  



 

-Belmont
Close @ 13th and Wedgewood



 

-Gale Park (ongoing)



 

gp_well_zps4b1e68b1.jpg

 

 



 

GalePark-Siteplan_zps009f8825-1.jpg



 

 

 

-TSU AG Building



 

TSUAG.png



 

-Fifth Avenue
Streetscape



 

fifthave.jpg



 

5thAveArtsRendering2.jpg



 

-Apartments at
Hume and Rosa Parks Evergreen in Germantown



 

RosaParksandHume.png



 

-Wound
Center @ Baptist



 

woundcenter.jpg



 

-Demonbreun
Lofts/ Faison Development



 

DemonbreunLofts.png



 

-23Hundred at Berry Hill (266 units) on 8th

 



 

23Hundred-at-Berry-Hill-2-300x200.jpg



 



 

-Fairfield Inn on Division (scheduled to start before end of
2012)



 

FFISgulch.png



 

-Chartwell Courtyard
Marriott in Green Hills



 

CourtyardbyMarriottInGreenHills.png



 

-XMi project on 19th and West
End



 

-1800 West End (Springhill
Suite & Residence Inn)



 

hotel-mixedusewestend.jpg



 

-6th
& Garfield



 

6thgarfield2.jpg



 

6thGarfield.jpg



 

-Mixed-use
project proposed for Germantown's Werthan Packing site



 

werthan2.jpg



 

WerthanProject1.jpg



 

gtown.png



 

-Sevier Park
Recreation Center



 

sevier20park_01.jpg



 

sevier20park_06.jpg



 

-HG Hill project on Broadway



 

HGHILLBROADWAY.jpg



 

-Village Green
Apartments 4 story expansion



 

-Holladay project @ Crescent
Furniture Building
on Jefferson rehab for 40,000 sq ft of office
space



 

-4th
and Monroe next
phase (only about 8 units)



 

-John C Hayes
project on Delaware
16 units



 

-Fatherland Flats



 

fatherlandflats_zps36bbc128.png



 

-Bridges to
Hearing renovation



 

Bridges20rendering.png



 

-Metro Transit
garage and Police Crime Lab in Madison



 

-Lexus of Nashville new
location in Metro
Center



 

 



 





 

Proposed & close to starting



 

-HG Hill apartment project on 21st & Blair



 

HillsboroVillageHGHillproject.png



 

Hill20Two.png



 

Hill20Four.png



 

-New 6 story apartment building on Rolling Mill Hill



 

RMH_images_1_zpsabb18ca3.jpg



 

 -Hilton Garden Inn on
Peabody and 3rd



 

HiltonGardenInn_zpsaab7feb9.jpg



 

HG3rdpeabody_zpsec555c02.png



 

-Ray Hensler 12th and Laurel (scheduled to start
before end of 2012 /23 story tower)



 

Hensler_rendering_092112_zpse26e2d7e.jpg



 

-Rehab of Voorhees building



 

voorhees.jpg



 

-Renasant Bank project on West End
(25,000 sq ft TN HQ) Scheduled start 6/13



 

-West End Summit



 

Old rendering:



 

imagesCAM2J7ZU.jpg



 

Updated rendering being the HQ of Parallon Business Solutions & Sarah Cannon Research
Institute. Also a third tower housing a 270 room Intercontinental hotel



 

West20End20Summit20New.jpg



 

-Apartments at
Main & McFerrin DBL A development



 

mcferrinmain.png



 

-Luxus Germantown
5th and Monroe (land has been purchased)



 

WalkGermantownWestEndPark01-26-2013005.j



 

http://www.luxusgermantown.com/



 

-ONEC1TY/ First building scheduled to start 2nd
qtr. of 2013 with second building to start soon afterwards. OneCityNashville.jpg



 

onecty_zpsd9ddf964.png



 

-Buckingham
Project on 21st



 

buckingham.png



 

buckinghawm4.jpg



 

buckingham1.jpg



 

-AmSurg building in Burton Hills



 

-Southern Land Project in Green Hills



 

Southernlandgreenhills.jpg



 

-Proposed
Hume-Fogg Gym Downtown



 

(Money now
approved, architect selected and rendering to follow)



 

-Proposed new
entrance @ 5th and Demonbreun for Bridgestone Arena



 

bridgestoneEntrance.jpg



 

BridgeStone2.jpg



 

-Proposed 16 unit
condo building at 24th & Acklen (Regent Homes Project)



 

-SoBro (rumored to start before end of 2012 or first of
2013/ 33 story tower)



 

sobro2_zpsc286d921.png



 

-Belmont University cafeteria and garage 4
stories



 

-Belmont University resident hall 6 stories



 

-Belmont addition to Thrailkill hall garage



 

-Proposed new Downtown police precinct on KVB & 6th



 

KVB6thpoliceprecint.jpg



 

  • Like 1
Link to comment
Share on other sites

Proposed

 

-First Baptist

Church expansion (ESa now

the architect for the project)

First-Baptist-main.jpg

firstbaptist1.jpg

firstbaptist.jpg

-703/705 Woodland was delayed and

back on track

705rendering2.jpg

-UI tower

conversion to apartments Music Row

uatower.jpg

-Strings building

(tell me it isn’t so)

strings.jpg

-Hotel @ Malloy and 4th

hotel01.jpg

-Northwest Mutual Project on Charlotte

ngulch.jpg

This is a 32 acre project that will be mixed use in nature

and phased in over a number of years. No renderings or information on this

project yet. Something should be announced next year. Demolition is continuing

at this site.

-Eakin tower next to Ray Hensler

Tower. 18 to 20 stories

(now being considered for construction end of 2013 or by mid 2014)

EakinPhase1.jpg

-505 CST

004-C_3-25x5.jpg

-Centennial

Park renovation

http://www.conservancyonline.com/docs/cpmp_master_plan_final.pdf

-5 office buildings in the Gulch totaling 1.5 million sq

feet. Proposed Pat Emory/Spectrum and Market

Street Development

Pictured Gulch Crossings building

15766745_BG2.jpg

gultch3.jpg

gulchofficeplan.jpg

Gulch Master Plan

gultch1.jpg

 

-Swerdling and

Assoc. 350 room hotel on the old proposed Westin site on lower -Broadway (no

rendering yet) would be close to a 100 million dollar project

 

-Westmont Apartments demolition and rebuild (5 story build

out)

Westmont.png

(Residents must be out in March 2013)

 

-Hotel project at 12th and Demonbreun across from

Proposed Eakin tower

Group out of Florida

has not disclosed full plans for property

 

-Old convention center site/Possible House of Blues location

 

-Thermal site downtown amphitheater

 

-Production Row on Cowan (high tech production studios

planned)

http://www.wsmv.com/story/19991448/cowan-st-would-be-center-of-production-row-activity

 

-Green & Little project in Green Hills

greenlittleproject.png

-Proposed apartments on 12 south  McRedmond Project

New rendering

McRedmond20Building.png

Old rendering

securedownload_zps5b14bfaf.png

-Next Phase of Riverfront development

5 million now approved

-Holladay project on Charlotte,

old state of TN property

holladayproject.jpg

 

-Proposed 11th and Pine Gulch Buildings

gultch5.jpg

gultch4.jpg

gultch6.jpg

-Metro Bank renovation to West End Office

metrobankwestendHQ.jpg

-Nashville

Skyline Project

 

http://nashville-skyline.com/welcome/

 

SKYLINE-POWERPOINT-33-copy.jpg

SKYLINE-POWERPOINT-25-copy.jpg

SKYLINE-POWERPOINT-24-copy.jpg

SKYLINE-POWERPOINT-23-copy.jpg

SKYLINE-POWERPOINT-22-copy.jpg

SKYLINE-POWERPOINT-20-copy.jpg

SKYLINE-POWERPOINT-18-copy.jpg

SKYLINE-POWERPOINT-17-copy.jpg

 

SKYLINE-POWERPOINT-87-copy.jpg

 

08.jpg

06.jpg

SKYLINE-POWERPOINT-86-copy.jpg

-Proposed apartments on Rosa Parks Meeks project 220 units

-Proposed new Downtown police precinct on KVB & 6th

KVB6thpoliceprecint.jpg

-West Park Village 15 unit townhomes

WEParkvillage_zps2be825e2.png

-Meharry Residential buildings 2, 4 story phase 1 and 1, 4

story phase 2

Meharry1.png

Meharry.png

-Proposed pedestrian bridge from MCC to the Gulch

gulchbridge_zpsb5223172.jpg

-Proposed Phase 1 of North Point Hospitality Group Residence

Inn@ 5th and KVB 12-15 stories. 225

rooms

-Phase 2 north Point Hospitality Spring Hill Suites 15- 18

stories

-Germantown Co-housing project @ Taylor and 5th

Co-Housing20render.png

-Proposed 300 unit apartments from Southern Land close to 17th

and Broadway

-Proposed Giarratana/ LaSalle project at 2300 Elliston Place 105 units

-Proposed Green Loop building

greenloop_zps679caf17.jpg

 

OUTSIDE OF CORE (Under

construction)

 

-NYC Mellon Bank Processing ctr. (Under construction)

 

tpc-2NYCMEllon2.jpg

 

tpc-1NYCMellon.jpg

 

-TSC HQ

 

TSCHQ.png

 

-Seven Spring Apartments (under construction)

 

seven_thumb-1.jpg

 

-Tapestry in Brentwood

(under construction)

 

tapestry_rendering_zps8302df97.jpg

 

036.jpg

 

-Hamilton Springs project in Lebanon (under construction)

 

HamiltonSprings-image1.jpg

 

HamiltonSprings2.jpg

 

-Life

Point Hospital

HQ (under construction)

 

lifepoint2.jpg

 

lifepoint1.png

 

 

 

-Franklin Park (under

construction) Starting with 10 story spec office building

 

officeFP_zps699dbf2f.jpg

 

HGOR20Masterplan20Rendering_zps179bd2f5.

 

 

 

-Mars

Pet Food $87 million, 90-acre pet food product innovation center in Thompson’s

Station,

(Under Construction)

 

 

 

Mars-center-sky-view-500px.jpg

 

-North

Fourth on Cleveland

(under construction)

 

6970397_orig.jpg

 

3811738_orig.jpg

 

-Virginia Springs

Brentwood

 

VirginiaSpringsmarylandfarms.png

 

virginiaspringsoffice.jpg

 

HCA Data

Center (under Construction)

 

hcanashvilledatacenterwebsite1.jpg

 

 

 

-Dwell

@ McEwen Phase 1 completed Phase 2 under construction

 

DwellMcEwen.jpg

 

-Berry Farms Mixed use project

 

berryfarms1.jpg

 

berryfarms2.jpg

 

berryfarms3.jpg

 

 

 

 

OUTSIDE OF CORE proposed

 

-South

Star Project in Cool Springs 147 acres (no plans or renderings yet)

 

 

 

-Duke

realty Project “Keystone Crossing” announced 2011.

 

-Centerview Project in Brentwood (Synergy Business

Park)

 

http://www.brentwoodhomepage.com/rezoning-request-new-hotel-in-synergy-business-parks-future-cms-10448-printer

 

-Chartwell Properties 4 story hotel in Centerview

 

-Crestview

Brentwood

 

office_crestview_brentwood.jpg

 

-Proposed Water and Snow Park

@ Opryland (project was to have involved Dolly Parton but she has pulled out

and a new development partner is being sought)

 

waterpark.jpg

 

-Metro Reuse of Hickory Hollow Mall

 

HHM.jpg

 

-The Streets of Brentwood

(scheduled for 2013start)

 

Streets20of20Brentwood20rendering.jpg

 

streetsofbrentwoodsiteplan.jpg

 

-Vanderbilt Medical Center campus in Williamson County

500,000 sq ft facility to consolidate all operations in Williamson County

to one location. Proposed start date 2013.

 

vandywilliamson.png

 

vandylocationfranklin.jpg

 

-Monroe Carell Children’s Hospital Williamson

County

 

williamssonmedchildrenshosp_zps18899326.

 

-“Greensboro North” Gallatin

 

Greensboronorth_zps59e6bffb.jpg

 

-Providence

Central

 

providencecentral_zps2b4d4c2b.jpg

 

 

 

 

 

 

 

 

 

As far as outside of the core I am not able to include

anything in Clarksville or Murfreesboro as they are filled with smaller

projects and are both over 30 miles away from the core.

 

  • Like 2
Link to comment
Share on other sites


 

Rumored Projects


 

-3 to 5 limited and full service hotels in SoBro/ Possible
companies that have been mentioned are Ritz, Holiday Inn, Westin, Choice
Hotels, and Peabody


 

Players include: Platinum Hotels, North Point Hospitality, and
Pinnacle Hotels


 

-Amphitheater at old Thermal plant site in SoBro


 

-St Thomas Baptist project @ 20th and Church
(part of campus master plan) No date set for construction,


 

-Mixed use development on Charlotte at West End Church of Christ site


 

-New dorms @ TSU


 

-HG Hill project on Charlotte Ave. 42nd
ave.


 

-Possible 25 story tower at NCC garage site. Possible
residential tower.


 

-Possible hotel project @ 8th and Demonbreun



 

-Rumored Hyatt Regency Hotel


 

-Rumored Moore
building project on Church to condos


 

-Alex Palmer unnamed project in midtown





 

Delayed and/or in question



 

 



 

-African
American Museum



 

NMAAA.jpg



 

-Pantheon Park, mixed use education/arts/media
campus downtown on 8th in SoBro



 

panthoenPark.jpg



 

The above rendering was to have been at 8th and
Demonbreun. Current location proposal is dead. Plans have now changed to a
hundred acre campus with HS and Jr. HS



 

-Federal Courthouse



 

federal-courthouse.jpg



 

-Sounds Baseball Stadium



 

-Metro
Nashville High
School of the arts. Proposed for the Capitol
District 5th Ave North



 

-Metro
Nashville Magnet
Elementary school
proposed for Lafayette St
and 5th



 

-Long awaited proposed State Archives building on 5th
South (project delayed indefinitely)



 

statearchives.jpg



 

NoCapPicture1126.jpg



 

 



 

-Long awaited proposed State Museum
on 5th South (project delayed indefinitely)



 

The last two projects are still in the works and there is
starting to be talk about a state bond issue.



 

-Vastland Project on Hayes



 

1725hayesvastland.jpg



 

-Villages of Donelson Hills (old Cumberland Yacht harbor
location)



 

-St Thomas Hospital 6 story patient tower. (Announced 2011)



 

-Lionstone office building on the roundabout (may be life
left in this at some point as the office mkt. improves/Lionstone still owns the
property)



 



I will fix the images tomorrow that are missing. Just too much to think about when I post this much. I will have to say Nashville is ON FIRE.

Link to comment
Share on other sites

  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.