3rd & Mildred Shute (3 & 4 stories, 64 units, ground level retail) update: framing underway on 3rd level.

Looking SW from intersection of 3rd Ave. South and Mildred Shute Ave:

3rd & Mildred Shute, April 29, 2023, 1.jpeg


Looking NW from 3rd Ave. South, 1/2 block north of Chestnut St:

3rd & Mildred Shute, April 29, 2023, 2.jpeg


Looking SE from Mildred Shute Ave., 1/2 block east of 4th Ave. South:

3rd & Mildred Shute, April 29, 2023, 3.jpeg

  • Like 3
  • Thanks 1
Link to comment
Share on other sites

This project right behind the Blue Parrot as far as taking a long time to get done. This one was first announced in 2014 and took years to get out of the ground and has taken longer to get the steel up! I am still baffled as to why it is in the shape it is right now.

  • Like 3
Link to comment
Share on other sites

301 15th Ave. North (7 stories, 179 units, ground level retail, internal garage) is moving foreard with Q&Q Holdings as the developer.   They have filed documents filed with the Metro Codes Department for a utilities easement.

The group paid $5 million for the roughly 0.90 acres in October 2021, while also having landed a $4.02 million loan from InsBank.

Nashville-based Catalyst Design Group is handling land-planning and engineering duties.

Still no renderings fro the project.

More behind the Nashville Post paywall here:

https://www.nashvillepost.com/business/development/real-estate-notes-image-released-for-prince-s-building/article_46ad9460-eb7d-11ed-9643-7f8a4884c289.html
 

301 15th Ave North, Jan 12, 2021, diagram.png


Looking NW from the intersection of 15th Ave. North and Hynes St. (there used to be a one story non-historic warehouse here):

301 15th Ave North, June 19, 2022.jpeg


This screen shot from Smeagolsfree's excellent development map shows the site highlighted in teal at the center of the frame:

573594187_30115thAveNorthQAHoldingsMay252022sitemap.png

  • Like 1
  • Thanks 1
Link to comment
Share on other sites

1 hour ago, smeagolsfree said:

This project right behind the Blue Parrot as far as taking a long time to get done. This one was first announced in 2014 and took years to get out of the ground and has taken longer to get the steel up! I am still baffled as to why it is in the shape it is right now.

I know, they seem to be finishing the top floor first?! Like what is even happening.

Link to comment
Share on other sites

Fusion WeHo (3 stories, 37 townhomes) update: Phase III complete; Phase IV foundations being laid.

Looking SW 1/2 block north of Hamilton Ave:

Fusion WeHo, April 29, 2023, 1.jpeg


Looking NW from intersection of Hagan St. and Hamilton Ave:

Fusion WeHo, April 29, 2023, 2.jpeg


Looking north from Hamilton Ave., 1/4 block west of Hagan St:

Fusion WeHo, April 29, 2023, 3.jpeg


Looking NW from Hamilton St., 1/4 block east of CSX tracks:

Fusion WeHo, April 29, 2023, 4.jpeg

  • Like 3
Link to comment
Share on other sites

On 5/8/2023 at 10:31 AM, MLBrumby said:

The first document states "7 stories" and "15 stories". What does that mean? 

On 5/8/2023 at 10:40 AM, Luvemtall said:

Also it states 7 stories-105feet, 15 stories- 150 feet. Wouldn’t the math then be  7 stories @ 105 feet = 15 foot floor to ceiling, so 15 stories would then = 225 feet if at the same 15 foot floor to ceiling height? Not 150 

Without looking at the documents, these figures are quoting the MUI-A zoning regulations. The 7 stories in 105' is max height allowed up against the street, then there is a required 15' stepback, then the remaining building can go up to 15 stories in 150'.  Many times a structure in MUI-A ends up at 13 stories because it would hit the 150' mark before 15 floors.

The zoning heights very rarely correlate between stories and actual feet. 

  • Thanks 2
Link to comment
Share on other sites

Broadstone Berry Hill (4 stories, 303 units, internal garage) update: starting 4th story.

Looking SE from Bransford Ave., just south of Craighead St:

Broadstone Berry Hill, April 29, 2023, 1.jpeg


Looking NE from Bransford Ave., 1/3 block south of Rosedale Ave:

Broadstone Berry Hill, April 29, 2023, 2.jpeg


Looking west from Rosedale Ave. at Grissom Drive:

Broadstone Berry Hill, April 29, 2023, 3.jpeg


Looking SW from Craighead St., just east of Bransford Ave:

Broadstone Berry Hill, April 29, 2023, 4.jpeg

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.