I think some of it depends on a disater declaration from Washington. Who knows if that will happen. I do think a lot of private money will come in play as well as State money.

I don't think two years is out of line.

Posted (edited)
1 minute ago, titanhog said:

So…how many structures are going to have to completely be torn down?  That’s the part that’s going to put a lump in my throat.

Minimum of 2 I’d say, based on pictures. Disclaimer, I am not a structural engineer. 

Edited by downtownresident
  • Like 1
Posted

Hopefully they save as much brick and other ‘old’ materials as they can scavenge…but in the end, I’m sure there are companies with tons of restoration materials to bring the place back to its original glory.

Posted

I’d hope some level of improvement will happen to the AT&T side of Second. Perhaps a minimal sidewalk is left with terraced landscaping against the building to provide added protection. Maybe a better effort to create fake storefronts at street level, though that is not my first choice. I’d like the facility moved and the site redeveloped. I just don’t think it will happen. 

  • Like 1
Posted

This was mentioned on the Bits & Pieces thread and I tend to agree that this may be the end of vehicular traffic on 2nd Ave. as part of the reinvention process. I can see this area as a new park/plaza. The real problem is if you close traffic off how do you reroute traffic from Commerce.

 Do you extend the plaza to part of Commerce too and force traffic to turn right of left onto Third. I will say that business owners will be dead set against this idea, but it may be necessary because of AT&T..

  • Like 1
Posted

The business owners on the east side of 2nd can use 1st Ave for loading. On the west side there is an alleyway that runs the length of it. If they must keep vehicle traffic, I would be in favor of removing parking, reducing the number of thru lanes, and extending the sidewalks out. 

  • Like 2
Posted

These facilities dot the downtowns of many cities across the country and if they started doing one then they would probably have to do all. Very expensive proposition.

Left over from the old Bell South Days.

Posted

Status update from AT&T today:

AT&T is waiving domestic, long-distance voice, and data overage charges through the holiday season for affected customers in 1166 zip codes across states like Tennessee, Kentucky, Indiana, Alabama, Georgia, Illinois and Missouri from December 25 to January 1

In general, it sounds like all structural damage is repairable. It's just going to take time. Lots of equipment and manpower is on-site or standby in case anything happens

 

**to answer an earlier question regarding timeline: services went offline when the batteries were drained after the generators stopped. After the explosion, the commercial power feeds to the building were damaged and went offline. This is an immediate fail over condition to battery (yes, for all equipment in the building). The generators will take <1 minute to come online and provide power.  The generators went offline after the natural gas was cut off, then the batteries were drained, and then everything lost power

In addition, the cooling plant was completely destroyed and with fire sprinklers, etc filling the building with water, fire is guaranteed - not "if", but "when" will it catch fire

Although service stayed online for a while, the Titanic had hit an iceburg

  • Like 3
  • Thanks 1

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.