gibby
Members+-
Posts
1,050 -
Joined
-
Last visited
-
Days Won
2
Content Type
Profiles
Forums
Gallery
Project Database
User Guide
Store
Events
Everything posted by gibby
-
The Edge | 32-Story Mixed Use + SunRail Station [Proposed/Demo Underway]
gibby replied to HankStrong's topic in Orlando
2020- 737 replies
-
- downtown orlando
- mixed use
-
(and 3 more)
Tagged with:
-
The Edge | 32-Story Mixed Use + SunRail Station [Proposed/Demo Underway]
gibby replied to HankStrong's topic in Orlando
Someone had mentioned November before. I hope that's still on (or sooner).- 737 replies
-
- downtown orlando
- mixed use
-
(and 3 more)
Tagged with:
-
The Edge | 32-Story Mixed Use + SunRail Station [Proposed/Demo Underway]
gibby replied to HankStrong's topic in Orlando
I'm expecting the new building to breathe life into CCS. Won't there be an entrance through the Bumby Arcade to get to the new building? Also, with the ballroom gone, folks will be able to walk along the west side of the tracks from South to Church, which should be a huge help and the southbound Sunrail station can finally move to its correct location.- 737 replies
-
- downtown orlando
- mixed use
-
(and 3 more)
Tagged with:
-
The Edge | 32-Story Mixed Use + SunRail Station [Proposed/Demo Underway]
gibby replied to HankStrong's topic in Orlando
I'm lost. Is there some significant demo of Church Street Station that was approved other than that crap ballroom? The private tenant issue seems to be miles away from being relevant to this approval.- 737 replies
-
- downtown orlando
- mixed use
-
(and 3 more)
Tagged with:
-
Has it been confirmed that both Phase 1 and Phase 2 are to be built together? I've seen kinda conflicting info on that.
-
In the Lymmo lane too.
-
I vote for Coffee House.
-
-
Both Pine and Central garage doors are always open when I walk by, including this morning. I don't think I've ever seen them closed. It's surprising that there isn't a cut-through traffic issue.
-
A Cambria Suites is under construction on the same property and a Best Western Premier will be starting soon across the street.
-
Downtown Houston has over forty full city blocks dedicated to surface parking lots. Surprisingly, they've done a good job keeping their street grid together though. Once we get rid of about 90% of our prime downtown surface parking lots, I'll start getting interested in height. Back on topic, I'm surprised that this project went ahead and applied for a foundation permit for tower #2. Does it seem more likely that they might do phases 1 and 2 together or is there some logistical reason that they would want to do the foundation for phase 2 early?
-
Foundation permit (BLD2019-15894) has been approved and no fees are due so this should be starting right away. They've also applied for vertical construction for tower 1 and a foundation permit for tower 2 but those were only submitted on Wednesday. Appears that they're calling the project Society Orlando now, unfortunately.
-
Construction plans for this project have been approved by the City. I expect that this could get started at any time.
-
I think the Downtown Development Board boundary looks nearly perfect, except maybe the area east of Lake Cherokee. The population numbers on their website are probably for the CRA boundary but that probably only inflates the number maybe 10-15%. I'm starting to think that their 43,000 population number might be pretty accurate for the CRA. I've counted around 12,500 units existing or under construction and that's just for buildings larger than 20 units. I'm surprised some planning group doesn't have a good database on all major US downtowns so apples to apples comparisons could be easier. http://www.downtownorlando.com/wp-content/uploads/2017/07/DwntwnCRA_DDB_Map-7.24.17-1.pdf
-
Thanks for the excellent analysis. I agree with basically all of this but I do think that Tampa has done way better with historic preservation compared to Orlando. I don't think that's even close. They also have an excellent downtown street grid (like Jax), which is mostly intact (compared to Orlando).
-
Is there a source for this? When was it decided that the building that Mary's is in will be torn down? Did I miss something?
-
http://www.downtownorlando.com/business/maps/#.XieqI8jYovc Using their maps and their list of multi-family developments, I'm coming up with 12,500 units. That excludes all housing under 20 units. They're showing a downtown area of about 1,700 acres. Miami shows a downtown area of about 2,400 acres.
-
I think downtown Orlando and Tampa each have about 15,000 and downtown Miami has about 90,000. It's hard to find a very good source for the info though.
-
Wow, we'll have Orange/Robinson, Radius, 520 Church and this thing all under construction at the same time. That's probably 1,000 to 1,500 units.
-
389 North (AKA Zoi House) | 41-Story Mixed-Use [Proposed]
gibby replied to ucfpatriot18's topic in Orlando
I checked the City permitting website and nothing has been submitted to the City for this property, other than the conceptual zoning approval application in 2018. -