Epicenter is really starting to take shape. You can make out the various store fronts and walkways - I really like this elevation change from the surrounding highrises. As far as we know, is Epicenter still on schedule for a late summer/early fall opening? Talk about a perfect time of year to go strolling through downtown at night!

Link to comment
Share on other sites

I ran by the entire complex yesterday, and it does look like the beginnings of the tower portion are taking shape. In the model the tower is angled some what with respect to the larger curved base, and if you look at some of the new pillars they have constructed, it seems to be going in that direction.

Also the front of epicenter is looking really good.

Link to comment
Share on other sites

By looking at the webcam for this project it looks like they are adding more sections to the tower for 210 Trade. :yahoo:

It took me a lil while to figure out what you were talking about, but I assume you are talking about more sections to the tower crane.

Link to comment
Share on other sites

It took me a lil while to figure out what you were talking about, but I assume you are talking about more sections to the tower crane.

Oops, I see that I did in fact not type the word *crane* after tower. :blush:

Can we assume that since these sections are being put in that 210 Trade is 100% go for launch as I don't see a need for them just for the lower part that is part of the EpiCentre project.

Link to comment
Share on other sites

Oops, I see that I did in fact not type the word *crane* after tower. :blush:

Can we assume that since these sections are being put in that 210 Trade is 100% go for launch as I don't see a need for them just for the lower part that is part of the EpiCentre project.

Yes we can assume it is a go. I am getting pretty nervous however, because it looks like they are putting up formed plastic foam insulation up which could suggest to Dryvit (EIFS) over on the retail sections. I am however quite confident in my sources, who have all said it would be stone and masonry. The only EIFS there was supposed to be was molding, I will go by tommorrow and check it out.

Link to comment
Share on other sites

Seems to be a another big pour night for Ghazi and company. This time it looks like they are laying concrete for the Theatre portion of the project. All in all this project is moving along quite smoothly. I would think that we should see the tower go verticle within a month or so at the current rate.

A2

Link to comment
Share on other sites

Seems to be a another big pour night for Ghazi and company. This time it looks like they are laying concrete for the Theatre portion of the project. All in all this project is moving along quite smoothly. I would think that we should see the tower go verticle within a month or so at the current rate.

A2

I agree, if you look at some of the supports at the top of what is there now, they seemed to be angled in such a way that it looks like the first floor of the tower part is imminent.

Link to comment
Share on other sites

Looking at your pictures, it appears they removed that overhead system of air ducts and generators thankfully.

Actually, I think you are referring to the ones on the BofA/Ritz-Carlton site on the next block over. Those are still there. I don't recall any on this block, but correct me if I am wrong.

Link to comment
Share on other sites

It can feel very odd to walk by the EpiCenter site in the middle of the day. The sun is up, it's getting hot... but you can feel that cool, cave-like air drifing out of there. I guess all the mass of the concrete which chilled overnight, causes the effect.

Link to comment
Share on other sites

Actually, I think you are referring to the ones on the BofA/Ritz-Carlton site on the next block over. Those are still there. I don't recall any on this block, but correct me if I am wrong.

I think you're right. Crap. We'll have to look at that ugly piping for a while longer.

Link to comment
Share on other sites

Looking good. It sure has a come a long way from the pile of rubble that once stood these.

Hey Mobuchu, was that you taking pictures around lunchtime on 6-5? I was actually on the 4th floor of the the BOA parking deck. Some goofball was trying to jump into the shot sevaral times.

Edited by dxartist
Link to comment
Share on other sites

Those right two renderings look more realistic and true to the current design. The far right rendering shows the cladding and smaller windows on the building like they have begun placing on the Trade St building. Overall not as impressive as the original all-glass design, but I'll take that over a pile of rubble.

Link to comment
Share on other sites

I have another construction question. Are we at the Movie Theater/Bowling Alley level on this corner? I know there will be a pool on top of this eventually, so what is all the steel sticking up out of this level? Is that support for the pool? I dont know that much about construction, but if anyone can enlighten me, that would be great.

Thanks in advance!!

SteelQuestion.jpg

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.