-
Posts
1,042 -
Joined
-
Last visited
-
Days Won
3
Content Type
Profiles
Forums
Gallery
Project Database
User Guide
Store
Events
Everything posted by CLT Development
-
To add to this, its very purpose built, number 1 goal is preserving views for the Condos.
-
Hilton Curio and Indigo Hotel have both been linked to adaptive re-use hotels in Charlotte that have not materialized in the past (Tryon Plaza and Hall House). I would LOVE to see a 21C here, thats my preference.
-
https://www.instagram.com/p/C6bMMPtuz7i/?utm_source=ig_web_copy_link&igsh=MzRlODBiNWFlZA== Been excited to announce this one with Jason! I would imagine this will be a pretty boutique hotel, around 200 keys.
-
-
There's a stage about half the height of the UNCC building that has been erected, its a pretty large presence.
-
NoDa (N Davidson St Arts District) Projects
CLT Development replied to uptownliving's topic in Charlotte
this is spot on to the NoDa I know and love. -
110 East: 23 story Tower by Stiles/Shorenstein
CLT Development replied to CLTProductions's topic in Charlotte
lol, that parcel is only big enough for one tower. lol -
Queensbridge Collective - 1 tower, maybe 2
CLT Development replied to CarolinaDaydreamin's topic in Charlotte
FLYING -
Gotta say, this doesn't sound NEARLY comprehensive enough I gotta say Nashville Fam, this doesn't seem to be nearly enough to meet Nashville's needs.
-
Queensbridge Collective - 1 tower, maybe 2
CLT Development replied to CarolinaDaydreamin's topic in Charlotte
I believe its 535,000 square feet, and I would think 40% is the going rate, though who knows what it is in today's lending climate. -
Queensbridge Collective - 1 tower, maybe 2
CLT Development replied to CarolinaDaydreamin's topic in Charlotte
Most of uptown is either back, or about to be back, to at least 4 days in the office. As far as Crescent goes, they would have to redesign and build something completely different to go to all residential and hotel. I think they believe that they can get an office tenant. They have received significant interest, and numerous friends/contacts in the office leasing industry have told me that "If we had new space in our inventory we could fill it tomorrow, we just don't have that space." And before you say "well what about 110 East," I don't think they've positioned that building well from a marketing standpoint, and the main contact isn't even in Charlotte. I'll be touring that building May 1st tho, so I'll report back :-). -
Southern Land Company tower (Tyber Creek Pub lot)
CLT Development replied to nicholas's topic in Charlotte
-
Queensbridge Collective - 1 tower, maybe 2
CLT Development replied to CarolinaDaydreamin's topic in Charlotte
Nothing is ready to go, the entire development is contingent on there being an office component. It cannot be built in phases. (referencing Carson). I do know that when I created my map for Center City Partner's State of the Center City the developer Crescent asked for me to reference a Q4 2024 Start, and that they were bullish on this. -
Legacy Union (former Charlotte Observer redevelopment)
CLT Development replied to Missmylab4's topic in Charlotte
I think Grease and Ventilation. Could be wrong, but its what I've heard from retail brokers -
without a doubt!
-
Queensbridge Collective - 1 tower, maybe 2
CLT Development replied to CarolinaDaydreamin's topic in Charlotte
Its amazing to me that people would think that, considering how skinny the building is, and the fact its concrete lol. -
It should just be temporary while the building goes through all the necessary hoops. It is in brownfields now, so there's a at least a year before this would conceivably break ground.
-
Legacy Union (former Charlotte Observer redevelopment)
CLT Development replied to Missmylab4's topic in Charlotte
Utility -
Legacy Union (former Charlotte Observer redevelopment)
CLT Development replied to Missmylab4's topic in Charlotte
From what I understand just getting it to the point where a restaurant could start construction (I don't think these spaces were built with grease traps or ventilation in mind) would be pricey, THEN you talk build out. McDonalds would need to do a whole lot of work, but they wouldn't be the worst tenant in the world. -
Dilworth Projects (Kenilworth, Morehead, East)
CLT Development replied to Southend's topic in Charlotte
Oh yea, they paused that one probably 6 months ago. -
Legacy Union (former Charlotte Observer redevelopment)
CLT Development replied to Missmylab4's topic in Charlotte
Plenty of places with higher asking price getting leased. -
Elizabeth Projects (7th St, Elizabeth Ave, etc)
CLT Development replied to JunktionFET's topic in Charlotte
Actually a big fan of this one. Really could make this stretch so much more urban. I would love to see a more urban 7th Street one day. -
they are making a parking lot! woo!
-
Legacy Union (former Charlotte Observer redevelopment)
CLT Development replied to Missmylab4's topic in Charlotte
I definitely agree, I know Lincoln Harris isn't fixing these buildings any time soon. I Just wanted to mention why they haven't been leased, and the steps you'd likely need to take to get them leased. -
Legacy Union (former Charlotte Observer redevelopment)
CLT Development replied to Missmylab4's topic in Charlotte
Its a gameday hassle really only because they close down so many streets, and there are plenty of ways/reasons to avoid this area. I see no problem with reducing it to two lanes.