Jump to content

CONSTRUCTION THREAD: Verdae


g-man430

Recommended Posts

17 hours ago, GvilleSC said:

It's terrible that they already let Ryan build an isolated development. 

The Ryan neighborhood won't stay isolated. The main road in the development, Algonquin, is planned to loop around and connect with the original Algonquin Trail, which is the dead end road on the north side of the park. Once that is complete it should tie in nicely. 

The one positive about the cart path connecting Bella Grove to Mangum is that will encourage non-automotive traffic within the neighborhood. I would prefer to see more pedestrians, cyclists, and even golf cart drivers, to additional cars on Rocky Slope. 

  • Like 1
Link to comment
Share on other sites


23 hours ago, johnpro318 said:

I think you are referring to the neighborhood closer to Legacy Park. This is a new one in between that neighborhood and Woodruff Road. This new one from the previous page doesn't have any other current connections besides Woodruff. There should be a connection to Magnum but it's only for carts. 

Sorry if my comment was confusing. Yes, Bella Grove is the new neighborhood off of Woodruff that was mentioned on the previous page. That is the one that will connect to Mangum with a 10' cart path.

The Ryan Homes neighborhood that GvilleSC referred to as isolated is Bellhaven Village. That is the one that will be connected to Algonquin Trail when construction is complete, so it won't remain isolated from the rest of Hollingsworth Park. 

 

Link to comment
Share on other sites

  • 3 months later...
1 hour ago, ausrutherford said:

 

Probably a part of the road widening. 

It's where they're clearing the whole square bounded by Verdae blvd, Old Sulphur Springs Rd, Salters Rd and Hilton St (if they aren't already demolishing that) to what appears preparation for residential or office space.   I think it's part of the grand Verdae plan but it's so tiny, there's no legible print.

 

Edited by bikeoid
Link to comment
Share on other sites

  • 1 month later...
  • 5 weeks later...
  • 1 month later...
  • 4 months later...
  • 1 month later...

The City of Greenville is requesting SEALED bids from qualified contractors for the Verdae Boulevard Streetscape Project. The proposed scope of work includes traffic control, street resurfacing, grading, curb and gutter, drainage, and 10’ wide concrete sidewalk/multi-use path, traffic signal upgrades, landscaping and lighting.

http://greenvillesc.gov/DocumentCenter/View/10252?bidId=120

http://greenvillesc.gov/DocumentCenter/View/10253?bidId=120

  • Like 1
Link to comment
Share on other sites

  • 2 months later...
  • 3 months later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.