Jump to content

Project Slugger office building in downtown Greensboro


cityboi

Recommended Posts

Finally steel beams rise from the ground!

20190917_175038.jpg

20190917_175318.jpg

20190917_175427.jpg

20190917_175501.jpg

20190917_175516.jpg

The steel beams appear to rise 3 stories which is 1/3 the way up. Its going to be a pretty tall 9-story building. The ceiling height on each floor will be taller than your typical building in downtown Greensboro. Looks like its going to be the equivalent of an average 11 or 12 story building

20190917_175546.jpg

20190917_175550.jpg

20190917_175619.jpg

Artist rendering of baseball themed crosswalk at the intersection. Also a generic block building across the street which will be the site of Carroll's 20-story office tower. And a 9 story Aloft hotel and 6 story apartments over retail will be next to that.  The intersection will resemble a baseball field and have statues of baseball players at each base including a statue of the former mascot dog Yogi.

5d1ce9f338cd6.image.jpg

Edited by cityboi
  • Like 4
Link to comment
Share on other sites


2 hours ago, KJHburg said:

what was the final height number of floors  I know it went down but then I think it went back up?  

I believe it went back up to the original 9 stories.  Given the fact that the height between the floors will be larger than normal (especially on the bottom floor), we'll probably see this rise about 120-140 feet.

  • Like 2
Link to comment
Share on other sites

15 hours ago, KJHburg said:

what was the final height number of floors  I know it went down but then I think it went back up?  

Yes the final height went back up to 9 floors. In addition its going to be a pretty tall 9 story building with the higher than usual ceilings on each floor even for an office tower. The height will be equivalent to a typical 11 or 12 story building and will appear taller from the lower seating bowl of the stadium than from the street. Also while the building will have 9 floors, the roof angles up to really about 10 stories.

Edited by cityboi
  • Like 2
Link to comment
Share on other sites

In the first photo you can see all the construction fencing put in place for the 8 story city parking deck and Carroll's South of the ballpark project. Looks like they are putting the steel in place by floors of 3s. Really soon we will see steel rise to the 9th floor.

20191012_090542.jpg

20191012_090632.jpg

20191012_091251.jpg

20191012_091454.jpg

Edited by cityboi
  • Like 2
Link to comment
Share on other sites

  • 2 weeks later...
  • 2 weeks later...
  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.