2 hours ago, GRDadof3 said:

The road improvements are described as work to “improve 14 bridges, along with concrete joint repairs, asphalt resurfacing, and high-friction surface coating on both directions of I-196 between Market Avenue and US-131.”

 

you forgot the best part....  "MDOT officials say the project will widen the stretch of highway from two to three lanes to ease traffic congestion and also include a  reconstruction of the Lake Michigan Drive interchange to improve safety "

 

 

Just kidding!  :tw_tounge_wink:

Link to comment
Share on other sites


15 hours ago, Floyd_Z said:

you forgot the best part....  "MDOT officials say the project will widen the stretch of highway from two to three lanes to ease traffic congestion and also include a  reconstruction of the Lake Michigan Drive interchange to improve safety "

 

 

Just kidding!  :tw_tounge_wink:

Right! And the onramp from Lane going Westbound onto I-196 will be lengthened so that it's not a death trap. Psych! 

Link to comment
Share on other sites

16 hours ago, Floyd_Z said:

you forgot the best part....  "MDOT officials say the project will widen the stretch of highway from two to three lanes to ease traffic congestion and also include a  reconstruction of the Lake Michigan Drive interchange to improve safety "

 

 

Just kidding!  :tw_tounge_wink:

Now that was just cruel to those of us who frequent that stretch.  I had about three seconds of hope...

  • Like 2
Link to comment
Share on other sites

2 hours ago, GRDadof3 said:

All lanes all ramps reopening by Nov 9th at the "flip" project except the eastbound 96 to East Beltline bridge (which I notice is not close to ready yet).

https://trib.al/RzLgC5e

 

Great news!  I wonder if they abandoned the Plymouth bridge reconstruction listed on the project website: https://www.michigan.gov/documents/mdot/I-96_I-196_Interchange_Open_House_635592_7.pdf

Link to comment
Share on other sites

I drove eastbound 196 to eastbound 96 today.  Lanes are open eastbound (thank goodness) but I noticed something interesting.  It's still the same route to get from EB 196 to EB 96, but there's pavement down to the left of that, which I had assumed was going to be the next 196 EB route.  The updates from MDOT and the media just reference that the 96 to E Beltline exit is left to be done. I'm wondering what's up with this other stretch of road.

 

 

Capture.JPG

On 11/2/2019 at 2:06 PM, GRDadof3 said:

I believe you're right. The whole project goes through Oct 2020 I believe. 

It's just odd that the updates from MDOT and the media indicate that the 96 to E Beltline bridge will be finished next year. No mention of other work on the project in 2020.

Link to comment
Share on other sites

12 minutes ago, draftpeppin said:

I drove eastbound 196 to eastbound 96 today.  Lanes are open eastbound (thank goodness) but I noticed something interesting.  It's still the same route to get from EB 196 to EB 96, but there's pavement down to the left of that, which I had assumed was going to be the next 196 EB route.  The updates from MDOT and the media just reference that the 96 to E Beltline exit is left to be done. I'm wondering what's up with this other stretch of road.

 

 

Capture.JPG

It's just odd that the updates from MDOT and the media indicate that the 96 to E Beltline bridge will be finished next year. No mention of other work on the project in 2020.

I don't think the media quite understands what's opening this weekend and what still needs to be done. And in their defense, it's an extremely complicated project. 

On your image, where the "2020" is, is the bridge from Eastbound 96 (think if you were coming from Plainfield going Eastbound) to the East Beltline exit. That lane will merge with a new exit ramp from downtown traffic going Eastbound and wants to get off at the Beltline. That "exit ramp" is being used as a temporary throughway for eastbound 196 traffic heading East past the Beltline. 

The new road you see to the left is the new "through" lane for Eastbound traffic going from downtown and heading further on to M-21, Cascade Road, 28th, etc.  It's not finished yet and won't be until next year (it appears). In addition, 196 Westbound between Fuller and this new mixing bowl will be expanded to 3 lanes. I believe too that Eastbound 196 will be rebuilt/repaved between Fuller and this interchange, which is why they're expanding the Plymouth Avenue bridge next year. 

How anyone scienced this out is beyond me. It's rather impressive actually, IMO. It just seems messed up right now. 

I did drive from Plainfield Ave and stayed on 96 Eastbound over the new bridge. It was a pretty interesting view of that area that I've never seen before. And Leonard St onramp is now open as well. Glad to finally see traffic taken off of Leonard Street. 

 

  • Like 2
Link to comment
Share on other sites

On 11/9/2019 at 12:21 PM, draftpeppin said:

It's just odd that the updates from MDOT and the media indicate that the 96 to E Beltline bridge will be finished next year. No mention of other work on the project in 2020.

iirc, the media was also saying that everything was to be open except for EBL to EB 96, but EBL to WB 96 is still closed. In fact all of the signage heading south on EBL made it very clear EBL to EB 96 is closed, but no mention of EBL to WB 96 being closed at all until you reach the ramp and see the barriers still up.

Link to comment
Share on other sites

3 hours ago, tSlater said:

iirc, the media was also saying that everything was to be open except for EBL to EB 96, but EBL to WB 96 is still closed. In fact all of the signage heading south on EBL made it very clear EBL to EB 96 is closed, but no mention of EBL to WB 96 being closed at all until you reach the ramp and see the barriers still up.

Yeah, that is/was supposed to be open. Wonder why it's not yet.

Link to comment
Share on other sites

The new Westbound section just as you reach the Beltline is so wide (4 lanes) people weren't even using the far left lane. You could tell because it was still covered in snow and none of the other lanes were. 

Traffic moves way faster through there than it used to. 

  • Like 1
Link to comment
Share on other sites

22 hours ago, GRDadof3 said:

The new Westbound section just as you reach the Beltline is so wide (4 lanes) people weren't even using the far left lane. You could tell because it was still covered in snow and none of the other lanes were. 

Traffic moves way faster through there than it used to. 

I was able to get into the I-196 lanes from the SB EBL->WB ramp without having to panic. Felt so nice.

  • Like 1
Link to comment
Share on other sites

  • 4 weeks later...

Quick question about improvements being done to Interstate 196. Is it in the plans for MDOT to widen the Interstate to 3 lanes both ways between Fuller Ave and the new 96/196/EB Interchange? 
 

Increasingly,  I was wondering why the new(ish) overpass of Fuller Ave over 196  was built with only 4 lanes and not 6 lanes in mind? Seems like a lack over foresight to build a new overpass in that spot without expansion of another lane for each first direction in the plans. 

I know this is the best place to come for questions like this so I appreciate the insight. Happy Holidays to everyone in this community by the way! 

 

 

Edited by EastCoaster93
  • Like 1
Link to comment
Share on other sites

3 minutes ago, EastCoaster93 said:

Quick question about improvements being done to Interstate 196. Is it in the plans for MDOT to widen the Interstate to 3 lanes both ways between Fuller Ave and the new 96/196/EB Interchange? 
 

Increasingly,  I was wondering why the new(ish) overpass of Fuller Ave over 196  was built with only 4 lanes and not 6 lanes in mind? Seems like a lack over foresight to build a new overpass in that spot without expansion of another lane for each first direction in the plans. 

I know this is the best place to come for questions like this so I appreciate the insight. Happy Holidays to everyone in this community by the way! 

 

 

Yes, 3 lanes each direction, my daughter worked on drawing up the plans :).  There's room for 3 each direction under Fuller

  • Like 1
  • Thanks 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.