Jump to content

The Plaza


Tim3167

Recommended Posts

  • Replies 2k
  • Created
  • Last Reply
Posted

nice shots tim

I'm amazed at how much space this thing eats up... almost like it engulfs an entire city block! it's going to be massive once it's done... really cool

Posted

Here is the layout of the theatres. All appear to be on one floor. It is hard to imagine them in that space. I wonder if they will have stadium style seating or not.

theatre9tv.jpg

Posted

it best have stadium seating if they want to compete with citywalk or PI.

<{POST_SNAPBACK}>

Or even the West Oaks Mall for that matter. :D

Posted

I would imagine this theatre would go vertical to cram all the screens into a tight space. The Ocean Walk development in Daytona Beach has a 10 screen theatre (with stadium seats) situated on a fairly small piece of land. The theatre lobby is on the second floor of this development, while the screens are located on the third and fourth floors. Here's a link with a picture that sort of shows what I mean:

http://www.oceanwalkshoppes.com

  • 2 weeks later...
Posted

Good news, after a long hiatus the webcam is finally up and running. Construction is coming along, the 3rd floor is almost complete. :)

Posted

Great thread.  I fully expect this theater to have stadium seating.  If you look closely at the plan, you can see the aisles for stadium seating.

<{POST_SNAPBACK}>

I work in the Copper Wopper and have been watching the construction on The Plaza from day one. There is no doubt that it will have stadium seating - the space where the theaters will go has been topped off and the ceilings are at least 30 feet high...

Posted

Good news, after a long hiatus the webcam is finally up and running.  Construction is coming along, the 3rd floor is almost complete.  :)

<{POST_SNAPBACK}>

It is about time becuase I need something to do at work!

  • 4 weeks later...
Posted

Yes, and then the big shadows will return to that portion of Orange Ave. Does anyone know if they are on or behind schedule at the Plaza? It does seem like they have a substantial amount of work to go in order to be open by next fall.

Posted

If they finish 3 floors per month, Solaire should be topped off by New Year's, leaving 9 whole months to work on the facade and interior. That seems feasible to me.

I think construction will pick up the pace once they three buildings get above the height of the pool level. That is, with less floor area to construct, each tower will be able to rise more quickly rather than having to finish one floor with a footpring the size of a city block before moving on to the next.

Posted

This seems like it will be a very interesting project. Is this some type of downtown Mall?

<{POST_SNAPBACK}>

Condo highrise. Two commercial towers.

BTW, I think this is going slowly for a simple reason. They are builing three high rises at one.

Posted

Condo highrise.  Two commercial towers.

BTW,  I think this is going slowly for a simple reason. They are builing three high rises at one.

<{POST_SNAPBACK}>

Yes, but three cranes.

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.