ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete **

Foundry/Sharpe Building - final phase: 2008

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos: Open ???

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace / Intercontinental: April 2008

Wayland Square Armory Condos: June 2008

NYLO Hotel - Pontiac Mill, Warwick: June 2008

T. F. Green Airport Terminal Renovations: July 2008

Weybosset Parking Towers: August 2008?

ALCO Phase 2: August 2008

JWU student services center - Rolo Building: September 2008

RISD Chace Center: September 27, 2008

Slater Mill lofts - Pawtucket: October 2008

Tower at Carnegie Abbey: November 2008

Capitol Cove Condos & apartments: December 2008 (phase 1 = 96 condos)

St. Francis chapel reno/addition to Hampton Inn: December 2008

Dunkin Donuts Center renovations (all phases): December 2008

Washington Bridge replacement: December 2008

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

Dynamo House & Heritage Harbor Museum: June 2009

Sierra Hotel: Mid 2009? (site demo underway)

Hilton parking garage: ?2009?

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009

New FM Global HQ building - Johnston: July 2009

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009

7th Wave Resort - indoor water park & resort: January 2010

Fogarty Building project (garage/retail): early 2010

BCBS new HQ: March 2010

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

RW's Zoo; 'North American Trail' & new Vet clinic: June 2010

Warwick Intermodal Transportation Center: June 2010

Wickford Rail Station: 2010

'W' hotel: June 2010 ??? (project on hold)

Vista Della Torre: mid to late 2010

Providence Piers/Conley Wharf project: 2010??

Empire at Broadway: December 2010

Roger William's Zoo 'Children's Zoo': June 2011

'Old' 195 highway demo & cleared, new streets: mid 2012

Waterfront Park: late 2012

East Pointe - EP: 2012

Kettle Point - EP: 2015

ALCO 'final' phases: TBD

updates needed:

anything with a "?"

Federal Hill condos and hotel proposals (that are more than just rumors)

Fogarty Bldg. - 111 Fountain St. (what's the deal with this one??)

Parcel 12 (won't be holding my breathe about this one)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites


  • Replies 266
  • Created
  • Last Reply
  • 1 month later...

ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete **

Foundry/Sharpe Building - final phase: 2008

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos & new Walgreens: ** Open/Complete **

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace / Intercontinental: Soon

Wayland Square Armory Condos: June 2008??

NYLO Hotel - Pontiac Mill, Warwick: July/August 2008

T. F. Green Airport Terminal Renovations: September 2008

Weybosset Parking Towers: Canceled???

ALCO Phase 2: August 2008

JWU student services center - Rolo Building: September 2008

RISD Chace Center: September 27, 2008

Slater Mill lofts - Pawtucket: October 2008

Tower at Carnegie Abbey: November 2008

Capitol Cove Condos & apartments: December 2008 (phase 1 = 96 condos)

St. Francis chapel reno/addition to Hampton Inn: December 2008

Dunkin Donuts Center renovations (all phases): December 2008

Washington Bridge replacement: December 2008

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

Wheeler School Expansion: 2009

Dynamo House & Heritage Harbor Museum: June 2009

Sierra Hotel: Mid 2009? (site demo underway)

Hilton parking garage: ?2009?

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009

New FM Global HQ building - Johnston: July 2009

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009

7th Wave Resort - indoor water park & resort: January 2010

Fogarty Building project (garage/retail): early 2010

BCBS new HQ: March 2010

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

RW's Zoo; 'North American Trail' & new Vet clinic: June 2010

Warwick Intermodal Transportation Center: June 2010

Wickford Rail Station: 2010

Providence Post Office expansion: 2010

'W' hotel: June 2010 ??? (project on hold?)

Vista Della Torre: mid to late 2010

Providence Piers/Conley Wharf project: 2010??

Empire at Broadway: December 2010

Roger William's Zoo 'Children's Zoo': June 2011

'Old' 195 highway demo & cleared, new streets: mid 2012

Waterfront Park: late 2012

East Pointe - EP: 2012

JWU Campus build-out: 2012

Kettle Point - EP: 2015

ALCO 'final' phases: TBD

updates needed:

check dates on "in-progress" projetcs

anything with a "?"

Federal Hill condos and hotel proposals (that are more than just rumors)

Fogarty Bldg. - 111 Fountain St. (what's the deal with this one?)

Parcel 12 (won't be holding my breathe about this one)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites

  • 2 weeks later...

ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete **

Foundry/Sharpe Building - final phase: 2008

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos & new Walgreens: ** Open/Complete **

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace / Intercontinental: Soon

Wayland Square Armory Condos: 2008??

NYLO Hotel - Pontiac Mill, Warwick: September 1, 2008

Weybosset Parking Towers: Canceled???

ALCO Phase 2: August 2008?

JWU student services center - Rolo Building: September 2008

RISD Chace Center: September 27, 2008

T. F. Green Airport Terminal Renovations: October 2008

Slater Mill lofts - Pawtucket: October 2008

Tower at Carnegie Abbey: November 2008

Capitol Cove Condos & apartments: December 2008 (phase 1 = 96 condos)

St. Francis chapel reno/addition to Hampton Inn: December 2008

Dunkin Donuts Center renovations (all phases): December 2008

Washington Bridge replacement: December 2008

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

Wheeler School Expansion: 2009

Dynamo House & Heritage Harbor Museum: June 2009

Sierra Hotel: Mid 2009? (site demo underway)

Hilton parking garage: ?2009?

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009

New FM Global HQ building - Johnston: July 2009

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009

Fogarty Building project (garage/retail): early 2010

BCBS new HQ: March 2010

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

RW's Zoo; 'North American Trail' & new Vet clinic: June 2010

7th Wave Resort - indoor water park & resort: September 2010

Warwick Intermodal Transportation Center: October 2010

Wickford Rail Station: 2010

Providence Post Office expansion: 2010

'W' hotel: June 2010 ??? (project on hold?)

Vista Della Torre: mid to late 2010

Providence Piers/Conley Wharf project: 2010??

Empire at Broadway: December 2010

Roger William's Zoo 'Children's Zoo': June 2011

'Old' 195 highway demo & cleared, new streets: mid 2012

Waterfront Park: late 2012

East Pointe - EP: 2012

JWU Campus build-out: 2012

Kettle Point - EP: 2015

ALCO 'final' phases: TBD

updates needed:

check dates on "in-progress" projetcs

anything with a "?"

Federal Hill condos and hotel proposals (that are more than just rumors)

Fogarty Bldg. - 111 Fountain St. (what's the deal with this one?)

Parcel 12 (won't be holding my breathe about this one)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites

I was at TF Green this morning dropping off a client after a morning meeting and noticed the NYLO Hotels Shuttle Van driving out of the airport on the connector road. There were passangers in the van so I figured I would follow to see if the hotel was open. Upon arrival at the hotel it was not open, but was informed that they are now taking reservations online for September 1........

Link to comment
Share on other sites

So who were those mysterious people in the van? and where did they go? The NYLO Hotel. Check in but never check out!!!! Nice investigative reporting Filmarch.

Can we add the new New England Tech campus to the list. Not sure what the completion date is but 2012 seems like a good guess.

Link to comment
Share on other sites

So who were those mysterious people in the van? and where did they go? The NYLO Hotel. Check in but never check out!!!! Nice investigative reporting Filmarch.

Can we add the new New England Tech campus to the list. Not sure what the completion date is but 2012 seems like a good guess.

I think they were the start-up / training crew that must be in from out of town. They were all wearing NYLO t-shirts and entered the hotel upon arrival.

Probably getting an orientation of the route the van will take to the airport.

Link to comment
Share on other sites

  • 2 weeks later...

ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete **

Foundry/Sharpe Building - final phase: 2008

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos & new Walgreens: ** Open/Complete **

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace / Intercontinental: Soon? - already open?

Wayland Square Armory Condos: 2008??

Weybosset Parking Towers: Canceled?

ALCO Phase 2: August 2008??

NYLO Hotel - Pontiac Mill, Warwick: September 2, 2008

JWU student services center - Rolo Building: September 2008

RISD Chace Center: September 27, 2008

T. F. Green Airport Terminal Renovations: October 2008

Slater Mill lofts - Pawtucket: October 2008

Tower at Carnegie Abbey: November 2008

Capitol Cove Condos & apartments: December 2008 (phase 1 = 96 condos)

St. Francis chapel reno/addition to Hampton Inn: December 2008

Dunkin Donuts Center renovations (all phases): December 2008

Washington Bridge replacement: December 2008

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

Wheeler School Expansion: 2009

Dynamo House & Heritage Harbor Museum: June 2009

Sierra Hotel: Mid 2009? (site demo underway)

Hilton parking garage: ?2009?

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009

New FM Global HQ building - Johnston: July 2009

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009

Fogarty Building project (garage/retail): early 2010

BCBS new HQ: March 2010

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

RW's Zoo; 'North American Trail' & new Vet clinic: June 2010

7th Wave Resort - indoor water park & resort: September 2010

Warwick Intermodal Transportation Center: October 2010

Wickford Rail Station: 2010

Providence Post Office expansion: 2010

'W' hotel: June 2010 ??? (project on hold?)

Vista Della Torre: mid to late 2010

Providence Piers/Conley Wharf project: 2010??

Empire at Broadway: December 2010

Roger William's Zoo 'Children's Zoo': June 2011

'Old' 195 highway demo & cleared, new streets: mid 2012

Waterfront Park: late 2012

East Pointe - EP: 2012

JWU Campus build-out: 2012

Kettle Point - EP: 2015

ALCO 'final' phases: TBD

updates needed:

check dates on "in-progress" projetcs

anything with a "?"

Federal Hill condos and hotel proposals (that are more than just rumors)

Fogarty Bldg. - 111 Fountain St. (what's the deal with this one?)

Parcel 12 (won't be holding my breathe about this one)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites

  • 3 weeks later...

ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete **

Foundry/Sharpe Building - final phase: 2008

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos & new Walgreens: ** Open/Complete **

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace / Intercontinental: Soon? - already open?

Wayland Square Armory Condos: 2008??

Weybosset Parking Towers: Canceled?

ALCO Phase 2: just started (August 2008)

NYLO Hotel - Pontiac Mill, Warwick: ** Open/Complete - September 2, 2008 **

JWU student services center - Rolo Building: September 2008

RISD Chace Center: September 27, 2008

T. F. Green Airport Terminal Renovations: October 2008

Slater Mill lofts - Pawtucket: October 2008

Tower at Carnegie Abbey: November 2008

Capitol Cove Condos & apartments: December 2008 (phase 1 = 96 condos)

St. Francis chapel reno/addition to Hampton Inn: December 2008

Dunkin Donuts Center renovations (all phases): December 2008

Washington Bridge replacement: December 2008

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

Wheeler School Expansion: 2009

Dynamo House & Heritage Harbor Museum: June 2009

Sierra Hotel: Mid 2009? (site demo underway)

Hilton parking garage: ?2009?

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009

New FM Global HQ building - Johnston: July 2009

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009

Fogarty Building project (garage/retail): early 2010

BCBS new HQ: March 2010

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

RW's Zoo; 'North American Trail' & new Vet clinic: June 2010

7th Wave Resort - indoor water park & resort: September 2010

Warwick Intermodal Transportation Center: October 2010

Wickford Rail Station: 2010

Providence Post Office expansion: 2010

'W' hotel: June 2010 ??? (project on hold?)

Vista Della Torre: mid to late 2010

Providence Piers/Conley Wharf project: 2010??

Empire at Broadway: December 2010

Roger William's Zoo 'Children's Zoo': June 2011

'Old' 195 highway demo & cleared, new streets: mid 2012

Waterfront Park: late 2012

East Pointe - EP: 2012

JWU Campus build-out: 2012

Kettle Point - EP: 2015

ALCO 'final' phases: TBD

updates needed:

check dates on "in-progress" projetcs

anything with a "?"

Federal Hill condos and hotel proposals (that are more than just rumors)

Fogarty Bldg. - 111 Fountain St. (what's the deal with this one?)

Parcel 12 (won't be holding my breathe about this one)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites

  • 4 weeks later...

Chase Center and Dunkin Doughnuts Center can be changed to green. Waterplace Park has tennants in one building but nothing on the first floor yet.

Something under construction is the Providence Technical High School. I would quess a competion date to be 2010.

Link to comment
Share on other sites

ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete **

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos & new Walgreens: ** Open/Complete **

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace Condo Towers I & II: ** Open / Complete - September 2008 **

Dunkin Donuts renovations: ** Open/Complete - September 2008 **

NYLO Hotel - Pontiac Mill, Warwick: ** Open/Complete - September 2, 2008 **

JWU student services center - Rolo Building: ** Open/Complete **

RISD Chace Center: ** Open/Complete - September 27, 2008 **

Weybosset Parking Towers: : Canceled

Slater Mill lofts - Pawtucket: October 2008

Tower at Carnegie Abbey: November 2008

T. F. Green Airport Terminal Renovations: December 2008

Capitol Cove Condos & apartments: December 2008 (phase 1 = 96 condos)

Foundry/Sharpe Building - final phase: 2008?

Wayland Square Armory Condos: 2008??

St. Francis chapel reno/addition to Hampton Inn: December 2008

ALCO Phase 2: just started (August 2008)

Washington Bridge replacement: December 2008

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

Wheeler School Expansion: 2009

Dynamo House & Heritage Harbor Museum: June 2009

Sierra Hotel: Mid 2009? (site demo underway)

Hilton parking garage: ?2009?

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009

New FM Global HQ building - Johnston: July 2009

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009

Fogarty Building project (garage/retail): early 2010

BCBS new HQ: March 2010

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

RW's Zoo; 'North American Trail' & new Vet clinic: June 2010

7th Wave Resort - indoor water park & resort: September 2010

Warwick Intermodal Transportation Center: October 2010

Wickford Rail Station: 2010

Providence Post Office expansion: 2010

'W' hotel: June 2010 ??? (project on hold?)

Vista Della Torre: mid to late 2010

Providence Piers/Conley Wharf project: 2010??

Empire at Broadway: December 2010

Roger William's Zoo 'Children's Zoo': June 2011

'Old' 195 highway demo & cleared, new streets: mid 2012

Waterfront Park: late 2012

East Pointe - EP: 2012

JWU Campus build-out: 2012

Kettle Point - EP: 2015

ALCO 'final' phases: TBD

updates needed:

check dates on "in-progress" projetcs

anything with a "?"

Federal Hill condos and hotel proposals (that are more than just rumors)

Fogarty Bldg. - 111 Fountain St. (what's the deal with this one?)

Parcel 12 (won't be holding my breathe about this one)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites

  • 2 weeks later...

ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete **

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos & new Walgreens: ** Open/Complete **

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace Condo Towers I & II: ** Open / Complete - September 2008 **

Dunkin Donuts renovations: ** Open/Complete - September 2008 **

NYLO Hotel - Pontiac Mill, Warwick: ** Open/Complete - September 2, 2008 **

JWU student services center - Rolo Building: ** Open/Complete **

RISD Chace Center: ** Open/Complete - September 27, 2008 **

Weybosset Parking Towers: : Canceled

Slater Mill lofts - Pawtucket: October 2008

Tower at Carnegie Abbey: November 2008

T. F. Green Airport Terminal Renovations: December 2008

Capitol Cove Condos & apartments: December 2008 (phase 1 = 96 condos)

Foundry/Sharpe Building - final phase: 2008?

Wayland Square Armory Condos: 2008??

St. Francis chapel reno/addition to Hampton Inn: December 2008

ALCO Phase 2: just started (August 2008)

Washington Bridge replacement: December 2008

IWAY: 95S to 195E ramp: December 2008

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

Wheeler School Expansion: 2009

Dynamo House & Heritage Harbor Museum: June 2009

Sierra Hotel: Mid 2009? (site demo underway)

Hilton parking garage: ?2009?

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009

New FM Global HQ building - Johnston: July 2009

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009

Fogarty Building project (garage/retail): early 2010

BCBS new HQ: March 2010

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

RW's Zoo; 'North American Trail' & new Vet clinic: June 2010

7th Wave Resort - indoor water park & resort: September 2010

Warwick Intermodal Transportation Center: October 2010

Wickford Rail Station: 2010

Providence Post Office expansion: 2010

'W' hotel: June 2010 ??? (project on hold?)

Vista Della Torre: mid to late 2010

Providence Piers/Conley Wharf project: 2010??

Empire at Broadway: December 2010

Roger William's Zoo 'Children's Zoo': June 2011

'Old' 195 highway demo & cleared, new streets: mid 2012

Waterfront Park: late 2012

East Pointe - EP: 2012

JWU Campus build-out: 2012

Kettle Point - EP: 2015

ALCO 'final' phases: TBD

updates needed:

check dates on "in-progress" projetcs

anything with a "?"

Federal Hill condos and hotel proposals (that are more than just rumors)

Fogarty Bldg. - 111 Fountain St. (what's the deal with this one?)

Parcel 12 (won't be holding my breathe about this one)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites

ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos & new Walgreens: ** Open/Complete **

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace Condo Towers I & II: ** Open / Complete - September 2008 **

Dunkin Donuts renovations: ** Open/Complete - September 2008 **

NYLO Hotel - Pontiac Mill, Warwick: ** Open/Complete - September 2, 2008 **

JWU student services center - Rolo Building: ** Open/Complete **

RISD Chace Center: ** Open/Complete - September 27, 2008 **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete - October 23, 2008 **

Weybosset Parking Towers: : Canceled

Slater Mill lofts - Pawtucket: October 2008

Tower at Carnegie Abbey: November 2008

T. F. Green Airport Terminal Renovations: December 2008

Capitol Cove Condos & apartments: December 2008 (phase 1 = 96 condos)

Foundry/Sharpe Building - final phase: 2008?

Wayland Square Armory Condos: 2008??

St. Francis chapel reno/addition to Hampton Inn: December 2008

ALCO Phase 2: just started (August 2008)

Washington Bridge replacement: December 2008

IWAY: 95S to 195E ramp: December 2008

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

Wheeler School Expansion: 2009

Dynamo House & Heritage Harbor Museum: June 2009

Sierra Hotel: Mid 2009? (site demo completed fall 2008)

Hilton parking garage: 2009 (project on hold?)

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009? (status unclear)

New FM Global HQ building - Johnston: July 2009

New Rt. 403 Highway: Fall 2009 (highway * opened 10/22/08 * - finish work remains)

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009 (status unclear)

Fogarty Building project (garage/retail): early 2010

BCBS new HQ: March 2010

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

RW's Zoo; 'Children's Zoo' & new Vet clinic: June 2010 (construction start = spring 2009)

7th Wave Resort - indoor water park & resort: September 2010

Warwick Intermodal Transportation Center: late 2010

Wickford Rail Station: 2010

Providence Post Office expansion: 2010

'W' hotel: June 2010??? (project on hold?)

Vista Della Torre: mid to late 2010

Providence Piers/Conley Wharf project: 2010??

Empire at Broadway: December 2010

Roger William's Zoo: 'North American Trail' upgrade & new polar bear exhibit: 2012

'Old' 195 highway demo & cleared, new streets: mid 2012

Waterfront Park: late 2012

East Pointe - EP: 2012

JWU Campus build-out: 2012

Kettle Point - EP: 2015

ALCO 'final' phases: TBD

updates needed:

check dates on "in-progress" projetcs

anything with a "?"

Federal Hill condos and hotel proposals (seems like they all became parking lots)

Fogarty Bldg. - 111 Fountain St. (what's the deal with this one?)

Parcel 12 (won't be holding my breathe about this one)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites

  • 2 weeks later...

ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos & new Walgreens: ** Open/Complete **

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace Condo Towers I & II: ** Open / Complete - September 2008 **

Dunkin Donuts renovations: ** Open/Complete - September 2008 **

NYLO Hotel - Pontiac Mill, Warwick: ** Open/Complete - September 2, 2008 **

JWU student services center - Rolo Building: ** Open/Complete **

RISD Chace Center: ** Open/Complete - September 27, 2008 **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete - October 23, 2008 **

Weybosset Parking Towers: : Canceled

Slater Mill lofts - Pawtucket: October 2008

Tower at Carnegie Abbey: November 2008

T. F. Green Airport Terminal Renovations: December 2008

Capitol Cove Condos & apartments: December 2008 (phase 1 = 96 condos)

Foundry/Sharpe Building - final phase: 2008?

Wayland Square Armory Condos: 2008??

St. Francis chapel reno/addition to Hampton Inn: December 2008

Washington Bridge replacement: December 2008

IWAY: 95S to 195E ramp: December 2008

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

Wheeler School Expansion: 2009

Dynamo House, Heritage Harbor Museum, Aloft Hotel: June 2009

Sierra Hotel: Mid 2009? (site demo completed fall 2008)

Hilton parking garage: 2009 (project on hold?)

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009? (status unclear)

New FM Global HQ building - Johnston: July 2009

New Rt. 403 Highway: Fall 2009 (highway * opened 10/22/08 * - finish work remains)

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009 (status unclear)

Fogarty Building project (garage/retail): early 2010

BCBS new HQ: March 2010

ALCO Phase 2: Spring 2010

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

RW's Zoo; 'Children's Zoo' & new Vet clinic: June 2010 (construction start = spring 2009)

7th Wave Resort - indoor water park & resort: September 2010

Warwick Intermodal Transportation Center: late 2010

Wickford Rail Station: 2010

Providence Post Office expansion: 2010

'W' hotel: June 2010??? (project on hold?)

Vista Della Torre: mid to late 2010

Providence Piers/Conley Wharf project: 2010??

Empire at Broadway: December 2010

Roger William's Zoo: 'North American Trail' upgrade & new polar bear exhibit: 2012

'Old' 195 highway demo & cleared, new streets: mid 2012

Waterfront Park: late 2012

East Pointe - EP: 2012

JWU Campus build-out: 2012

Kettle Point - EP: 2015

ALCO 'final' phases: TBD

updates needed:

check dates on "in-progress" projetcs

anything with a "?"

Federal Hill condos and hotel proposals (seems like they all became parking lots)

Fogarty Bldg. - 111 Fountain St. (what's the deal with this one?)

Parcel 12 (won't be holding my breathe about this one)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites

ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos & new Walgreens: ** Open/Complete **

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace Condo Towers I & II: ** Open / Complete - September 2008 **

Dunkin Donuts renovations: ** Open/Complete - September 2008 **

NYLO Hotel - Pontiac Mill, Warwick: ** Open/Complete - September 2, 2008 **

JWU student services center - Rolo Building: ** Open/Complete **

RISD Chace Center: ** Open/Complete - September 27, 2008 **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete - October 23, 2008 **

Weybosset Parking Towers: : Canceled

Slater Mill lofts - Pawtucket: October 2008

Tower at Carnegie Abbey: November 2008

T. F. Green Airport Terminal Renovations: December 2008

Capitol Cove Condos & apartments: December 2008 (phase 1 = 96 condos)

Foundry/Sharpe Building - final phase: 2008?

Wayland Square Armory Condos: 2008??

St. Francis chapel reno/addition to Hampton Inn: December 2008

Washington Bridge replacement: December 2008

IWAY: 95S to 195E ramp: December 2008

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

Wheeler School Expansion: 2009

Sierra Hotel: Mid 2009? (site demo completed fall 2008)

Hilton parking garage: 2009 (project on hold?)

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009? (status unclear)

New FM Global HQ building - Johnston: July 2009

New Rt. 403 Highway: Fall 2009 (highway * opened 10/22/08 * - finish work remains)

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009 (status unclear)

Fogarty Building project (garage/retail): early 2010

BCBS new HQ: March 2010

ALCO Phase 2: Spring 2010

Dynamo House, Heritage Harbor Museum, Aloft Hotel: June 2010

RW's Zoo; 'Children's Zoo' & new Vet clinic: June 2010 (construction start = spring 2009)

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

Providence Post Office expansion: 2010

Vista Della Torre: mid to late 2010

Warwick Intermodal Transportation Center: late 2010

Wickford Rail Station: 2010?

'W' hotel: 2010? (project on hold - summer 2008)

Providence Piers/Conley Wharf project: 2010?

7th Wave Resort - indoor water park & resort: Late 2010? - project on hold (11/08)

Empire at Broadway: December 2010

Roger William's Zoo: 'North American Trail' upgrade & new polar bear exhibit: 2012

'Old' 195 highway demo & cleared, new streets: mid 2012

Waterfront Park: late 2012

East Pointe - EP: 2012

JWU Campus build-out: 2012

Kettle Point - EP: 2015

ALCO 'final' phases: TBD

updates needed:

check dates on "in-progress" projetcs

anything with a "?"

Federal Hill condos and hotel proposals (seems like they all became parking lots)

Fogarty Bldg. - 111 Fountain St. (what's the deal with this one?)

Parcel 12 (won't be holding my breathe about this one)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites

  • 2 weeks later...

ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos & new Walgreens: ** Open/Complete **

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace Condo Towers I & II: ** Open / Complete - September 2008 **

Dunkin Donuts renovations: ** Open/Complete - September 2008 **

NYLO Hotel - Pontiac Mill, Warwick: ** Open/Complete - September 2, 2008 **

JWU student services center - Rolo Building: ** Open/Complete **

RISD Chace Center: ** Open/Complete - September 27, 2008 **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete - October 23, 2008 **

Weybosset Parking Towers: : Canceled

Slater Mill lofts - Pawtucket: October 2008

Tower at Carnegie Abbey: November 2008

IWAY: 95S to 195E ramp: December 6, 2008

T. F. Green Airport Terminal Renovations: December 2008

Capitol Cove Condos & apartments: December 2008 (phase 1 = 96 condos)

Foundry/Sharpe Building - final phase: 2008?

Wayland Square Armory Condos: 2008??

St. Francis chapel reno/addition to Hampton Inn: December 2008

Washington Bridge replacement: December 2008

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

Wheeler School Expansion: 2009

Sierra Hotel: Mid 2009? (site demo completed fall 2008)

Hilton parking garage: 2009 (project on hold?)

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009? (status unclear)

New FM Global HQ building - Johnston: July 2009

New Rt. 403 Highway: Fall 2009 (highway * opened 10/22/08 * - finish work remains)

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009 (status unclear)

Fogarty Building project (garage/retail): early 2010

BCBS new HQ: March 2010

ALCO Phase 2: Spring 2010

Dynamo House, Heritage Harbor Museum, Aloft Hotel: June 2010

RW's Zoo; 'Children's Zoo' & new Vet clinic: June 2010 (construction start = spring 2009)

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

Providence Post Office expansion: 2010

Vista Della Torre: mid to late 2010

Warwick Intermodal Transportation Center: late 2010

Wickford Rail Station: 2010?

'W' hotel: 2010? (project on hold - summer 2008)

Providence Piers/Conley Wharf project: 2010?

7th Wave Resort - indoor water park & resort: Late 2010? - project on hold (11/08)

Empire at Broadway: December 2010

Roger William's Zoo: 'North American Trail' upgrade & new polar bear exhibit: 2012

'Old' 195 highway demo & cleared, new streets: mid 2012

Waterfront Park: late 2012

East Pointe - EP: 2012

JWU Campus build-out: 2012

Kettle Point - EP: 2015

ALCO 'final' phases: TBD

updates needed:

check dates on "in-progress" projetcs

anything with a "?"

Federal Hill condos and hotel proposals (seems like they all became parking lots)

Fogarty Bldg. - 111 Fountain St. (what's the deal with this one?)

Parcel 12 (won't be holding my breathe about this one)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites

  • 2 weeks later...

ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos & new Walgreens: ** Open/Complete **

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace Condo Towers I & II: ** Open / Complete - September 2008 **

Dunkin Donuts renovations: ** Open/Complete - September 2008 **

NYLO Hotel - Pontiac Mill, Warwick: ** Open/Complete - September 2, 2008 **

JWU student services center - Rolo Building: ** Open/Complete **

RISD Chace Center: ** Open/Complete - September 27, 2008 **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete - October 23, 2008 **

IWAY: 95S to 195E ramp: ** Open/Complete - December 6, 2008 **

Weybosset Parking Towers: : Canceled

Slater Mill lofts - Pawtucket: October 2008

Tower at Carnegie Abbey: November 2008

St. Francis chapel reno/addition to Hampton Inn: December 2008

Foundry/Sharpe Building - final phase: 2008?

Wayland Square Armory Condos: 2008??

Washington Bridge replacement: December 2008 (partial completion 12/6/08 - anyone??)

Capitol Cove Condos & apartments: January 2009 (phase 1 = 96 condos)

T. F. Green Airport Terminal Renovations: January 2009

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

NEW: Former Medical Society Bldg. renovation - new Moran Shipping HQ: Spring 2009

NEW: IWAY: 195W to 95: May 2009

Wheeler School Expansion: 2009

Sierra Hotel: Mid 2009? (site demo completed fall 2008)

Hilton parking garage: 2009 (project on hold?)

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009? (status unknown)

New FM Global HQ building - Johnston: July 2009

New Rt. 403 Highway: Fall 2009 (highway * opened 10/22/08 * - finish work remains)

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009 (status unknown)

Fogarty Building roject (garage/retail): early 2010

BCBS new HQ: March 2010

ALCO Phase 2: Spring 2010

Dynamo House, Heritage Harbor Museum, Aloft Hotel: June 2010

RW's Zoo; 'Children's Zoo' & new Vet clinic: June 2010 (construction start = spring 2009)

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

Providence Post Office expansion: 2010

Vista Della Torre: mid to late 2010

Warwick Intermodal Transportation Center: late 2010 - significant contruction underway: late 2008

Wickford Rail Station: 2010?

'W' hotel: 2010? (project on hold - summer 2008)

Providence Piers/Conley Wharf project: 2010?

7th Wave Resort - indoor water park & resort: Late 2010? - project on hold; funding (11/08)

Empire at Broadway: December 2010

Roger William's Zoo: 'North American Trail' upgrade & new polar bear exhibit: 2012

'Old' 195 highway demo & cleared, new streets: mid 2012

UPDATED: ALCO 'final' phases: 2012

East Pointe - EP: 2012

JWU Campus build-out: 2012

Waterfront Park: late 2012

Kettle Point - EP: 2015

updates needed:

check dates on "in-progress" projetcs

anything with a "?"

Federal Hill condos and hotel proposals (seems like they all became parking lots)

Fogarty Bldg. - 111 Fountain St. (what's the deal here?)

Parcel 12 (won't be holding my breathe)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites

  • 1 month later...

ALCO Phase 1: ** Completed 1/2007 **

AS220 Dreyfuss: ** Open/complete **

Providence Renaissance Hotel (Masonic Temple): ** Open/complete **

Westin II Hotel addition: ** Open/Complete **

Wickenden St. Comm CTR & Library: ** Open/Complete **

IWAY: I-95N to I-195E opens (new bridge): ** OPEN **

Westin II Condo tower: ** Open/Complete **

333 Atwells Condos & new Walgreens: ** Open/Complete **

Miriam Hospital expansion: ** Open/Complete **

Davol new HQ - Warwick at the Crossings: ** Open/Complete **

Waterplace Condo Towers I & II: ** Open / Complete - September 2008 **

Dunkin Donuts renovations: ** Open/Complete - September 2008 **

NYLO Hotel - Pontiac Mill, Warwick: ** Open/Complete - September 2, 2008 **

JWU student services center - Rolo Building: ** Open/Complete **

RISD Chace Center: ** Open/Complete - September 27, 2008 **

Roger William's Zoo; 'Plains of Africa' upgrade: ** Open/Complete - October 23, 2008 **

IWAY: 95S to 195E ramp: ** Open/Complete - December 6, 2008 **

Weybosset Parking Towers: : Canceled

Slater Mill lofts - Pawtucket: October 2008?

Tower at Carnegie Abbey: November 2008?

Foundry/Sharpe Building - final phase: 2008?

Wayland Square Armory Condos: 2008?

Washington Bridge replacement: December 2008 (partial completion 12/6/08 - anyone??)

Capitol Cove Condos & apartments: January 2009? (phase 1 = 96 condos)

UPDATED:St. Francis chapel reno/addition to Hampton Inn: February 2009

UPDATED:T. F. Green Airport Terminal Renovations: February 2009

Women and Infants Hospital renovation: March 2009

RI Hosp. Bridge Building expansion: March 2009

Former Medical Society Bldg. renovation - new Moran Shipping HQ: Spring 2009

IWAY: 195W to 95: May 2009

Wheeler School Expansion: 2009

Sierra Hotel: Mid 2009? (site demo completed fall 2008)

Hilton parking garage: was 2009 (project on hold)

Weybossett Mills Condo renovation: June 2009

4 points Sheraton Promenade St.: June 2009? (status unknown)

New FM Global HQ building - Johnston: July 2009

New Rt. 403 Highway: Fall 2009 (highway **opened** 10/22/08 - finish work remains)

Bradley Hospital expansion: November 2009

Ethanol Plant - Quonset: December 2009? (status unknown)

Fogarty Building roject (garage/retail): early 2010?

BCBS new HQ: March 2010

ALCO Phase 2: Spring 2010

Dynamo House, Heritage Harbor Museum, Aloft Hotel: June 2010

RW's Zoo; 'Children's Zoo' & new Vet clinic: June 2010 (construction start = spring 2009)

Residence Inn - downcity: 2010

Newport Hilton/Marriott - 310 W Main Rd.: 2010

Providence Post Office expansion: 2010

Vista Della Torre: mid to late 2010

Warwick Intermodal Transportation Center: late 2010 - significant contruction underway: late 2008

Wickford Rail Station: 2010?

'W' hotel: 2010? (project on hold - summer 2008)

Providence Piers/Conley Wharf project: 2010?

7th Wave Resort - indoor water park & resort: Late 2010? - project on hold; funding (11/08)

Empire at Broadway: December 2010?

Roger William's Zoo: 'North American Trail' upgrade & new polar bear exhibit: 2012

'Old' 195 highway demo & cleared, new streets: mid 2012

ALCO 'final' phases: 2012

NEW:Sakonnet River Bridge replacement: 2012

East Pointe - EP: 2012

JWU Campus build-out: 2012

Waterfront Park: late 2012

Kettle Point - EP: 2015

updates needed:

check dates on "in-progress" projetcs

anything with a "?"

Federal Hill condos and hotel proposals (seems like they all became parking lots)

Fogarty Bldg. - 111 Fountain St. (what's the deal here?)

Parcel 12 (won't be holding my breathe)

etc.

any others???

GREEN= open/complete

BOLD = in progress

RED = announced/planned

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.