-
Posts
373 -
Joined
-
Last visited
-
Days Won
1
Content Type
Profiles
Forums
Gallery
Project Database
User Guide
Store
Events
Everything posted by d8alterego
-
Grand Rapids Airport (GRR) News and Developments
d8alterego replied to joeDowntown's topic in Grand Rapids
That's why I believe such a "downtown GR to airport" line could work. A new rail line that travels through undeveloped land serves no one once it is opened (ie the Denver airport line). The difference is that this line would travel through existing neighborhoods along an existing rail line. Feeder bus routes could collect riders and drop them off at stations along the route adding more local riders besides flying travelers. GR has never had that level of transit interconnectivity with rail and bus systems. Plus high density redevelopment potential is there in warehouse and commercial districts toward the airport. Can we imagine a 28th street corridor with 5 over 1 residential structures (or greater density) and walkable neighborhoods? While future ridership and development projections should of course be studied, I've seen the success of transit oriented development first hand. Also, I believe this would be a 10 mile rail line compared to a 18+ mile line from Detroit to DTW. Thus I would think it would be cheaper and more attractive for Lansing to support it. -
Grand Rapids Airport (GRR) News and Developments
d8alterego replied to joeDowntown's topic in Grand Rapids
A BRT line with that many station stops and traffic signals (even if given signal priority) would probably not entice the flying public who want an express mode of transit to and from the airport (Rail = 5 or 7 stops to BRT = 22 stops). -
Grand Rapids Airport (GRR) News and Developments
d8alterego replied to joeDowntown's topic in Grand Rapids
You make a good point regarding the ridership of the Q line, but the Q line does not terminate at the airport nor would this airport line interact with street traffic. I can see locals and flying travelers using this line more frequently. Also, has any transit line in America been self sustaining? High ridership successes? Yes. Cost effective? I don't believe any are. Return on investment? Depends on studies and planning. -
Grand Rapids Airport (GRR) News and Developments
d8alterego replied to joeDowntown's topic in Grand Rapids
I agree that there are large industrial areas now but I can see a lot of redevelopment into residential and commercial uses in future decades. The moment a station on an airport light rail line opens, developers take notice. I can see the line having anywhere between 5-7 stops total which should make it attractive to ride and quick enough to get from city center to the airport. -
Grand Rapids Airport (GRR) News and Developments
d8alterego replied to joeDowntown's topic in Grand Rapids
Since I no longer live in Grand Rapids, nor Michigan, I'm not sure I'm the one to do so. However I still love GR so much that I follow this UP channel. -
Grand Rapids Airport (GRR) News and Developments
d8alterego replied to joeDowntown's topic in Grand Rapids
According to Bloomberg it costs, on average for light rail, above $100 million per mile. The potential 10 mile rail line I drew, even though it utilizes an existing rail corridor, would cost somewhere around $1 billion. But this line would not travel through rural areas waiting to be developed. The density is already there to immediately benefit those areas. The redevelopment potential, in my opinion, would bring in far more than $1 billion in residential and commercial property taxes over the years. -
Grand Rapids Airport (GRR) News and Developments
d8alterego replied to joeDowntown's topic in Grand Rapids
As much of a fantasy as this may be, how about a rail system? I could see a lot of development/growth at stations along the route; especially along the 28th Street corridor. -
Tyson's Corner will soon be home to the tallest tower in the DC region. BISNOW
-
"The Boro" phase 1 in Tyson's is complete. BISNOW
-
"The Corner" development is now open. Curbed Detroit
-
New renderings of Amazon HQ2. Link is here: Curbed DC
-
If it was torn down, I wish the city would buy it and turn it into a park. While I am sure that option would not be cheap, more people would be able to enjoy that view.
-
DC and Baltimore Area Mass Transit/Transportation
d8alterego replied to monsoon's topic in Baltimore-Washington DC
-
Studio Park - $140 Million Celebration Cinema/mixed use project
d8alterego replied to joeDowntown's topic in Grand Rapids
Do we know if the theater will have eye popping signage or does the billboard law (mentioned earlier) also effect the front of the theater? For instance, a version of this: -
Hello West Michiganians. It has been a very long time since I last commented on the GR UP forum but I have stopped by on occasion to catch up on new developments. I am very proud of GR and I miss living there. However I recently read an article by CityLab that confused me: "To provide context, we do a rough comparison of these 50 cities to America’s 53 large metros (with more than 1 million people). We exclude two metros, Charlotte and Grand Rapids, Michigan, because they experienced significant boundary changes that would have affected their results; that leaves a comparison group of 51." CityLab I'm curious as to how the Grand Rapid's city boundary changed. Was land annexed recently by the city?
-
"The redevelopment of the Landmark Mall, a mostly shuttered shopping mall in Alexandria, is moving through the entitlement process, and owner Howard Hughes is unveiling new details about the first phase. The Howard Hughes Corp. Senior Vice President Mark Bulmash tells Bisnow the developer is planning a 1.5M SF to 2M SF Phase 1 with a potential mix of residential, retail, hotel, office and other public facilities." bisnow
-
DC and Baltimore Area Mass Transit/Transportation
d8alterego replied to monsoon's topic in Baltimore-Washington DC
Commuting between DC and SW Virginia by bus has been mostly a success. GGWashington -
DC and Baltimore Area Mass Transit/Transportation
d8alterego replied to monsoon's topic in Baltimore-Washington DC
"The Fairfax County Board of Supervisors signed off this week on a $372 million project to widen a 3.1-mile stretch of Richmond Highway between Jeff Todd Way and Sherwood Hall Lane. The project aims to increase capacity along the busy stretch of roadway south of where Metro’s Yellow Line ends at Huntington by widening the roadway from four to six lanes and reversing the median for a future bus rapid transit system." bizjournal -
"Executives from nonprofit Institute for Defense Analyses Inc. joined Alexandria officials Tuesday to break ground on IDA’s new Potomac Yard headquarters... The 370,000-square-foot structure is expected to open early 2022." bizjournal
-
DC and Baltimore Area Mass Transit/Transportation
d8alterego replied to monsoon's topic in Baltimore-Washington DC
Finalized renderings of the infill Metro rail station at Potomac Yards in Alexandria. Estimated completion by "early 2022." -
Looks like two 30 story towers are planned for Rosslyn.
-
DC and Baltimore Area Mass Transit/Transportation
d8alterego replied to monsoon's topic in Baltimore-Washington DC
Silver Line opening date (tentative): July 2020. It is 8 months behind schedule. -
DC and Baltimore Area Mass Transit/Transportation
d8alterego replied to monsoon's topic in Baltimore-Washington DC
-
DC and Baltimore Area Mass Transit/Transportation
d8alterego replied to monsoon's topic in Baltimore-Washington DC
Apparently the new Virginia Ave. CSX tunnel is allowing more freight trains but causing commuter rail backups. Washington Post Nonstop weekday Amtrak service between DC and NYC. Washington Post -
idroveazamboni, I'm assuming you lived in Silver Spring back in the day before being, now, in Huntington? I work in Silver Spring and live in Huntington. The commute isn't bad as long as metro is working. I recognize the view from your balcony. Updated pic of Purple Line construction at the Silver Spring transit center.