Jump to content

southslider

Members+
  • Posts

    3,320
  • Joined

  • Last visited

  • Days Won

    7

southslider last won the day on July 17 2014

southslider had the most liked content!

Recent Profile Visitors

6,774 profile views

southslider's Achievements

Town

Town (6/14)

1.7k

Reputation

  1. Just end the line in Downtown Matthews, so it can be a single track with less impact to Downtown Matthews streets and buildings. The sportsplex is barely TOD and has high utility relocation costs. CPCC Levine has extra cost to go over 485. The nearby planned yard off Monroe Rd at the Matthews border with Charlotte could quickly add trains, if worried about single track capacity in Downtwon Matthews.
  2. Move this concept one block northeast or across Trade Street along Wilkes Place and you have the actual temporary station seriously considered by Amtrak.
  3. The BRT study along 77 North completed years ago (see CATS website under Red Line) incorporates the very changes the NCDOT projects are doing and will soon be doing to respective exits 23 and 25. However, those projects are not building any of those BRT designs, which is a huge missed opportunity by Lake Norman decision-makers. Area residents already hate that they were tricked into a private concession for toll lanes, and yet here is an opportunity for more public use and throughput on 77.
  4. Huntersville successfully pushed NCDOT to include two additional bridges either side of Exit 25, while largely ignoring any access to Northcross Park and Ride. Having NCDOT build just a bit more for functional BRT is easily way more practical and realistic than getting NSRR to sell or share their corridor for Red Line. But such a pragmatic approach would require Town officials, several of them just newly elected, to actually have real conversations with NCDOT, rather than aspirational talk with NSRR.
  5. Except BRT doesn't require one big project, but can be built up with smaller projects, especially now that the Express Lanes are already built. The real missed opportunities are Exit 23 currently under construction and Exit 25 soon also in construction. Pull-off, in-line BRT stations are in the cost range of the planned Hambright Park and Ride, which is already funded without any sales tax increase.
  6. Always thought Graham St could use a road-diet for sidewalks, but double-tracking Red Line sure would be a nice bonus.
  7. This is sloppy reporting, as the 77X was split up following the opening of the Cornelius Park and Ride. The combination of all four Express routes traveling I-77 north of Uptown shows much more steady ridership collectively.
  8. Convincing North Mecklenburg that Red Line isn't light rail is as challenging as convincing Americans that a third-pound burger has more meat than a quarter-pounder.
  9. Future NC Rail corridors range from already committed S-Line to highly unlikely O-Line.
  10. The express lanes are open to HOV 3+ for free (NC Quick Pass transponder set to HOV), plus motorcycles and CATS Buses
  11. 25th St Station next to the much larger actual railyard north of town has hardly been hurting for TOD. And if the complaint is how that limits TOD to one side, then what Wilmore surely needs is TOD squeezing it from BOTH Blue Line and Silver Line. Besides, a future station could always build a pedestrian bridge, like Sugar Creek Station, another area hardly hurting for TOD. And really, any station next to this much smaller "railyard" isn't even funded, and just a concept along the second phase of an also unfunded first phase of Silver Line. The passenger rail maintenance facility is actually programmed, and very much needed to support the very nearby relocated passenger rail station, which is ironically moving from being next to that truly big railyard just north of Uptown.
  12. Carson would no longer connect to 277 and be extended to Clarkson and/or continue to Freedom. Such changes are all part of the 77 South project that includes reconfiguring the 77/Belk interchange.
  13. Carson Blvd will be extended to Clarkson St to mitigate any closing of Summit Ave.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.