Just wanted to note that I saw contractors up on a lift hanging out outside a top floor window. and all the sidewalks around the building were yellow taped this morning. Does this mean work is comencing? I don't know.

Link to comment
Share on other sites


  • Replies 96
  • Created
  • Last Reply
  • 2 weeks later...

AS220 {sodEmoji.{sodEmoji.|}} Dreyfuss Hotel Project

v21-AS220-Dreyfuss.jpg

AS220 at the Dreyfuss

I don't know why a thread was never started for this, but I'm starting one now.

Just wanted to note that I saw contractors up on a lift hanging out outside a top floor window. and all the sidewalks around the building were yellow taped this morning. Does this mean work is comencing? I don't know.

Historical restoration in the city ?. Seems like a Good move. General observations look like it is kick-off time.

Step back in time ? Awesome plan!

Link to comment
Share on other sites

I need to see hammers. :P Seriously, if AS220 is planning a groundbreaking ceremony, which I would assume they are, I'd switch the status after that.

The contractor is in the building protecting the historic features that will be saved. It's amazing how tuned in everyone here seems to be on the comings and goings around the city. The lift that was at the Dreyfus a couple of weeks ago was on site for less than 2 hours to inspect the windows.

Construction (demo) has definitely begun. Stay tuned for the official groundbreaking.

Link to comment
Share on other sites

It's amazing how tuned in everyone here seems to be on the comings and goings around the city. The lift that was at the Dreyfus a couple of weeks ago was on site for less than 2 hours to inspect the windows.

One of the advantages of being a pedestrian rather than a driver. If I had been driving by, I probably wouldn't have noticed it.

Link to comment
Share on other sites

http://www.pbn.com/contentmgr/showdetails.php/id/119867

Johnston-based TRAC Builders Inc. has been chosen by AS220/121 Washington Street Ltd. Partnership as the general contractor to transform the former Dreyfus Hotel into affordable live and work studios for artists.

Link to comment
Share on other sites

OK, so this has gotta count. Today I saw scaffolding up and guys with hard hats going in and out!

Hard hats you say, did they have hammers in their hands? Were any of them whistling at attractive women? It's not in-progress until the cat-calls start.

Link to comment
Share on other sites

Hard hats you say, did they have hammers in their hands? Were any of them whistling at attractive women? It's not in-progress until the cat-calls start.

We'll have to go over to the Mall, grab Renee Zellweger, and have her walk by.

Link to comment
Share on other sites

  • 1 month later...

AS220 {sodEmoji.{sodEmoji.|}} Dreyfuss Hotel Project

v21-AS220-Dreyfuss.jpg

AS220 at the Dreyfuss

I don't know why a thread was never started for this, but I'm starting one now.

Just wanted to note that I saw contractors up on a lift hanging out outside a top floor window. and all the sidewalks around the building were yellow taped this morning. Does this mean work is comencing? I don't know.

I have heard rumors about a bunch of possibilities for restaurants in the Dreyfuss. Does anyone know if there have been any deals signed?

Link to comment
Share on other sites

I have heard rumors about a bunch of possibilities for restaurants in the Dreyfuss. Does anyone know if there have been any deals signed?

I saw some great pictures of inside the dreyfus on art in ruins. It would make for a pretty classy bar if fixed up a little, probably the type that other guy who was looking for good scotch would go to.

http://www.artinruins.com/arch/redevelop/dreyfus/

Link to comment
Share on other sites

I was talking to the owner (I think) of Kevin's Smoke Shop across the street when I went to the Providence Geek dinner this week. He told me the plans are to renovate the bar area into a restaurant (he said they were going to preserve the bar in particular) The next two floors were going to be artist's lofts and possible art galleries/retail on the top floor. He said the bar in particular was beautful and "wait to you see it" when they finish renovating it.

Link to comment
Share on other sites

I was going to ask if anyone knew AS220s timetable for this, then I decided to take a look at their site for the project. It recently had the start work in Dec. '05 timetable. It now says work to begin March '06 (check) and complete March '07.

Link to comment
Share on other sites

  • 1 month later...
  • 3 months later...
  • 1 month later...

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.