930 Poydras turned out to be much nicer than I thought it would be.
As for the BioInovation Center, what's up with that? They were driving test pilings a few months ago, but now nothing. The Tulane/LSU Cancer Center is going up nicely, though.
As for the Saenger, it is nice that the marquee is turned on, although only one side of it blinks as it was designed. However, it does not appear that anything else is going on. If significant construction was happening, you'd think that the area around the building would be cordoned off to allow for construction contractor trucks, etc. This project MUST happen. The Loews State Palace and Orpheum could be spurred back by a success with the Saenger.
It seems like the only development going on besides single/multi-residential housing is road paving, which is much needed. I'm glad that Earhart is finally being finished and that Carrollton and St. Charles are also progressing. That being said, what about smaller residential streets? Whatever happened to paving assessments, when the city would assess each piece of property a fee to repave the street? I'd chip in to have my block repaved!