I have no idea what is going on Beattie and will find out.
The building proposed by a Columbia developer for the site across from City Hall, next to the Hot Dog King, is a 15 - 20 story building with two stories of parking under and retail on the main level. Even talk of a small grocery. I have spoken to the developer and they plan to do about 75% office ( lease/condo?) and the top 2-4 stories as residential. They have passed the Design Preservation Committee (DPC) and are ready to go when the property is all assembled and they get the final mix determined.
We are very involved in RiverPlace and there is no redesign being considered through the first phase that ends at the Hampton Inn and Suites and the Plaza/ Water feature.
Phase Two of RiverPlace only has one building defined at this point.and is the first true mixed-use development in Downtown. It is a six story building and will be retail /restaurants on the river/first floor with office space for lease on the second floor. The next four floors are residential, called Terrace at RverPlace, and approx. half were sold at our Reservation Auction last week.
Beyond that, it is anybody's bet for the final mix on the balance of Phase Two , which ends at River Street . Phase Three is the property from River Street to Academy Street and hopefully the Kroc Center will follow the Reedy River from there.