Reputation
-
Concur. And that was even with a MDHA Design Review Committee permit. In 2025 the East Bank Redevelopment District expires, leaving only the Gallatin Road UDO in place, which makes even the “urban” building placement and glazing requirements in the base zoning voluntary. This UDO was put in place after a court threw out the former Gallatin Road Improvement Plan SP that had placed urban requirements on building permits in the pre-Nashville Next days. A property owner sued Metro over that and this UDO making urban requirements “voluntary” was the result. Canceling or replacing that UDO would require outreach to all of the affected property owners, and it would essentially be adding restrictions back onto to their properties, albeit just the -A district base zoning requirements. Unless, of course, there was an effort to add new requirements. The UDO question would be complicated, and may be impacted by the nature of the prior lawsuit that threw out the previous SP.
-
March has been working with me and Metro Planning for quite a while now to update the site plan for the next phases of Walden. One of the facets was a prior requirement to extend 18th Street up to Eastland. While I ordinarily support connectivity, the topography in that location makes building the street in the existing right of way infeasible. If you know that area, you know that those streets back there are tiny, lack sidewalks, and have a lot of topography and visibility issues (especially on McEwen), and so creating a vehicular connection to Eastland here makes conditions worse, not better. I walked the site with NDOT’s chief engineer who approved this plan to cap the street with a hammer-head turnaround for fire trucks, garbage, etc. We are working through approvals for an abandonment. The revised site plan lines McEwen with townhomes and moves some things around to have a larger mixed-use presence along Eastland.
-
After hearing comments for and against this project the Planning Commission unanimously recommended approval of this SP at last night’s meeting. It will now move on to Metro Council for a public hearing scheduled for August 1st.
- 7 replies
-
- 16
-
- ca south developers
- belpointe developer
- (and 4 more)
-
The RISE East Nashville SP is on the agenda for tonight’s Planning Commission public hearing. Please participate in the public hearing if your schedule permits. We would welcome any constructive feedback.
- 42 replies
-
- 9
-
- rise investors developer
- studios architecture
- (and 3 more)
-
I will be holding a community meeting about the 800 Main Street project on Wednesday, May 31st at 6:00 p.m. at East Park Community Center. This project lies along the boundary between Districts 5 and 6 and it aligns with some multimodal transportation projects that Council Member Sean Parker and I have been working on, so we are holding this meeting jointly. We encourage anyone who is interested to attend. Right now this item is scheduled for the June 8th Metro Planning Commission meeting agenda.
-
The small lot sizes, the fact that a lot of those parcels up on Ozark and Glenview, etc, are accessed primarily by an alley that lacks infrastructure to such a degree that NDOT cannot repave it without causing stormwater runoff problems, and the overall topography make significant density increases or even DADUs difficult to construct and support. This is one of those areas where the conditions on the ground belie the geography. It would require huge assemblages of parcels - potentially entire blocks - in order to get the infrastructure requirements to pencil out for private development of any meaningful density increases on Davidson, Ozark, Glenview, maybe even Lenore. Certainly along the east side of 14th. But yes, I agree with you that a larger vision for this portion of Shelby Hills and the Davidson corridor is needed to tie in with the Envision Cayce Master Plan. I have been advocating for that for several years now, and my rezoning of 690 and 1106 Davidson to MUG-A was meant to test the market’s appetite for that. Obviously the Imagine East Bank Vision Plan implied that but did not include the area east of I-24 in the planning study area. I don’t have time left in my term to compete a UDO for the area. My hope is that if I can pass this SP that it will be a starting point and a reference document for a future UDO or planning study or small area plan.
- 7 replies
-
- 10
-
- ca south developers
- belpointe developer
- (and 4 more)
-
It appears that the former Pawn Shop building at 801 Gallatin (NEC Gallatin/Seymour) will be renovated into a Bank of America branch office. That makes sense given that the Inglewood BofA branch at Gallatin/Stratford closed and the ATM at 800 Main will have to be relocated when that parcel is redeveloped.
-
As for access to the #56 inbound, this location is steps from the signalized crosswalk at West Greenwood where there is a brand new WeGo bus shelter that was installed as a condition of the Hill Center Greenwood development. This general area of Gallatin has a light and signalized crosswalk at Douglas, McKennie and West Greenwood and so crossing Gallatin in this immediate area is easier and safer than perhaps any other section of Gallatin. Previously H.G. Hill Realty had envisioned a five-story apartment building here. I don’t recall any ground-floor retail in that proposal. But there is no lack of ground-floor commercial space in that vicinity. There is a right of way dedication requirement for the Gallatin frontage so any building would step back from the street a little bit but not too much.
-
Most of the Envision Cayce buildings will have residential units on the ground floor. Having residential units face the street does activate the street more than having screened parking podiums, for instance. If the units can have doorways facing the street, then that provides even more interaction along the street. At least as much as in the townhomes. These buildings probably will have more street-level activation than the Eastside Heights building, which has taken many years to fill even a small amount of corner retail space. Vacant, papered-over retail spaces do not an activated street make. The Cherry Bark Oak Apartments building (Boscobel IV) works around a champion heritage tree specimen and addresses a fairly steep north-south topographic change while providing a lot of green space for trees lawns, which has been a major priority for the East Nashville community. The trees themselves promote traffic calming and provide for a pleasant pedestrian experience along South 6th Street, which is a local street that is almost entirely residential or institutional in use. For the most part, the Envision Cayce Master Plan calls for corner commercial spaces to face the planned central green space to support smaller businesses in a much calmer and more enjoyable environment that is centrally located for campus residents rather than along an outside edge of the campus that doesn’t even border on another neighborhood. The west side of South 5th Street is likely to remain the home of the Fire Department/OEM/Rescue, DCSO, NDOT/Public Works and other utilitarian uses for our lifetimes. Residential and other dense infill on the west side of 5th is supported by the community plan, but these civic uses aren’t likely to move anytime soon. Across Crutcher lies an NES substation. The proposed new East Bank bridge would lift at Crutcher and go over the river, so what remains of 5th from Crutcher to Davidson would likely not have retail activation for obvious reasons. A lot of that area south of Crutcher is also in the flood plain and retail cannot be constructed at grade level in a flood plain. So South 5th Street is not necessarily going to support the a lot of ground-floor retail other than up at 5th/Shelby where the Envision Cayce Master Plan calls for more intense mixed uses including a grocery or a larger retailer that also offers groceries. On the other hand, adding the large number of housing units here is exactly what is required to support those targeted retail corners and mixed uses along the central green space and further up at the Shelby bike lanes and bus line. As for Shelby House itself, the building on the corner is the actual Samaritan Recovery Community building for in-patient recovery services. They don’t necessarily need or want lots of people coming and going in and out of their lobby. But at the same time, this will not be a blank wall by any means. A lot of the other Shelby House building faces will have residential units on the ground floor connecting to or close to the street. But the corner building is the recovery center itself. Preliminary plans anticipated that the townhome units north of this building along South 5th Street going toward Fatherland would be live-work units that may have ground-floor retail or office spaces with loft apartments above. Those plans are still in process. But in any event, this building will have more pedestrian interest than the 1960s Edgefield Manor cottages across the street. And it will have nearly 375 affordable housing units including many deeply affordable units. That affordable housing need next to the East Bank is more important to Nashville’s future growth than creating just another retail pocket that few of the thousands of affordable housing residents living nearby would likely be able to afford to patronize frequently anyway.
-
The prior plan was to introduce mixed uses to generate sales taxes to pay bonds for Metro’s share of the renovation costs. Some people are crying about sports bars and singer-songwriter spaces in the renovation plan. Those were there to help generate the sales taxes within the capture area to fund Metro’s obligations toward the renovation to meet the current lease obligations. Then the cost estimates came in far higher than what these revenues could fund. That’s when the Titans went back to the State to seek the hotel tax option. Then Governor Lee asked why an enclosed stadium was not being proposed and he put the $500M in his budget to fund the approximate cost difference of a domed or enclosed stadium so that Tennessee can compete with several surrounding states for several events that we lose due to lack of an enclosed stadium. But yes, I agree with you that the public spaces of this proposal are a real selling point, literally. They will activate the facility, the proposed park and the entire neighborhood and generate lots of sales taxes on site that help to lay for the stadium.
- 1,550 replies
-
- 11
-
- metro nashville sports authority
- mayor john cooper
- (and 4 more)
-
This property was rezoned to an SP in 2015 by my predecessor. The SP includes single-family houses off of Village Court at the top of the hill and a multifamily building along Davidson at the bottom of the hill. The property owner is submitting a SP amendment proposal. The main change is to request additional height for the multifamily building atop the parking garage. The parking garage addresses the flood plain issue by lifting the housing above that flood plain elevation. In light of the multistory mixed use buildings that are likely to go in across Davidson along the riverfront, the property owner is requesting additional floors of residential units above the parking garage on this site. Yes, these are all industrial buildings currently. I rezoned the 690 and 1106 Davidson Street buildings from industrial/warehouse to mixed use about two years ago. Those buildings were acquired and are being considered as part of a property assemblage for a larger mixed use riverfront project.
-
Land Lease. I worked with the owners of two parcels at 690 and 1106 Davidson to rezone them from industrial to mixed use. That served to stop further industrial/warehouse use of those properties. It also served to test the market for further mixed use investment along the Davidson Street corridor. I am looking forward to the fruits of that effort moving forward sooner rather than later.
-
I have renderings of this project. It steps the height back from Woodland Street so that most of the tower portion kind of aligns with the parking garage of Eastside Heights. It’s a very contemporary design. There is a parking garage entrance off of Woodland closest to Eastside Heights where there is also a parking garage entrance. In this location alley access isn’t really feasible, though. It seems possible to me that similar to the new LaQuinta, this parking garage will make spaces unused by hotel guests available as paid public parking for events. The SP allows a greater floor area ratio than the base zoning in order to accommodate the greater height and building volume. The SP will also proving glazing and design guidance facing I-24 snd, by extension, the East Bank and downtown. This project is located within the MDHA East Bank Redevelopment District, which will be expiring in 2025. MDHA’s Envision Cayce Master Plan calls for replacing the CWA apartment buildings between S 4th Street and I-24 with a 12-story building. And so, taken together, these new construction buildings will begin to create a canyon effect along the eastern face I-24 between Shelby and Woodland that will create a gateway effect into East Nashville at both of those interchanges.
- 17 replies
-
- 18
-
- fulmer lucas engineering
- sun development & management