- Popular Post
Metro
-
Posts
57 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Project Database
User Guide
Store
Events
Posts posted by Metro
-
-
Crawler crane is being assembled.
-
It looks like components for a crawler crane might be on the site, though I didn't get a clear look so I could be wrong.
- 1
-
A 2nd crawler crane is on the site. Looks like they're getting the caisson drill ready.
- 1
-
The sign for the French bakery is now up.
- 3
-
On 2/4/2020 at 12:06 PM, spenser1058 said:
But have the port-a-potties arrived? That’s when, ummm, poo gets real.
(We’d call in Ron Paul but he’s busy with Iowa caucus conspiracies at the moment...)
Two port-a-potties are on the northwest side of the site near the LYNX SunRail station.
-
A fabric screen is now up on the fence so that's some progress.
- 1
- 1
-
Nope, just the fence.
- 1
-
A chain link fence is now up around the site so construction could be starting soon.
- 2
-
The tower crane is coming down.
- 1
-
A caisson drilling rig is now on site.
- 1
-
The old white house that had the law office is being torn down today.
-
The caisson drilling rig is on the site.
- 3
-
2 bulldozers and an excavator now on site.
- 3
- 1
-
A bulldozer is now on the site, was just parked there as of this morning.
- 3
-
- Popular Post
- Popular Post
Here is the webcam link: https://www.drphillipscenter.org/explore/webcam.stml/
- 5
-
It looks like the base of a tower crane for phase 2 is in place.
- 1
-
I walked by the site today and saw what looks like the base of a tower crane being installed.
-
It looks like the pilings are going in, so I guess this is now officially under construction.
- 1
-
According to the Tras4mation public information staff, the new South Street/Hughey Avenue on-ramp will open next Tuesday morning, November 18th.
-
On the web cam, it looks like the tower crane will be going up soon.
-
From Orlando Business Journal:
"At the risk of jinxing progress at the AMC theater in The Plaza, it looks like construction on the long-awaited entertainment venue may finally begin.
Meyer Development Services Inc. of Homosassa has been granted a building permit to do $2.5 million worth of construction at 155 S. Orange Ave.
We're not going to hold our breath."
-
It looks like there is finally some activity at the Channel 55 (Majesty) Building in Alt. Springs, with new windows being installed on the lower floors.
-
OBJ Peabody expansion article
-
I just heard through a friend that AMC Theaters backed out of the Plaza due to some fire wall rating that wasnt up to their requirements but I havnt seen anything about it here. ( I am currently in NY). Is it true?
A recent article on Church Street Station in either the Sentinel or OBJ mentioned that Cameron Kuhn will be announcing "soon" who the theater operator in the Plaza will be.
Modera Central | 23-Story Residential
in Orlando
Posted
The DGX store is now open.