Jump to content

Melrose

Members+
  • Posts

    335
  • Joined

  • Last visited

Posts posted by Melrose

  1. 10 minutes ago, Bos2Nash said:

    I think this is an interesting insight into how some smaller companies may utilize their space in the future. If my math is correct (not always a given with me haha), even if a different 32 employees came each day, they still wouldn't have space for 10 of their employees. It's almost like co-working, but within your own space haha

    Even larger companies are planning in this manner,  with few or no designated offices/cubes and a plan that individual employees are only in 2-3 days a week in a staggered manner....

    • Like 3
  2. On 1/4/2024 at 6:25 AM, markhollin said:

    Signature of Music Row (6 stories, 105 units, ground level retail, internal garage) update.

    Looking NW from 16th Ave. South, 1/3 block south of Grand Ave:

    Signature Music Row, Dec 31, 2023, 1.jpeg


    Looking SW from intersection of Grand Ave. and 16th Ave. South:

    Signature Music Row, Dec 31, 2023, 2.jpeg


    Looking SE from Grand Ave., 1/2 block east of 17th Ave. South:

    Signature Music Row, Dec 31, 2023, 3.jpeg

    I continue to root for this one to be finished before the STR Hotel around the corner that has taken waaaay longer. 

  3. 4 minutes ago, Bos2Nash said:

    To be fair, Music City Bread does still appear on Google Maps lol.

    I only ever went to Cabana once and the service was TERRIBLE! My wife had been prior to that had a relatively good experience (hence she wanted to go back). Last time we went there. 

    I guess they were just operating out of the kitchen there, perhaps?  The restaurant portion seemed to have been closed for awhile.

    Cabana was a big deal when it opened back in the mid-2000's but had seem to have run its course by around 2011 or so.  There was a documentary-style TV show on like  A&E or HGTV or something like that would document the build out and opening of one restaurant in each episode.  Most of the restaurants were in Canada, but they did do an episode on Cabana....  

     

     

    • Like 1
  4. On 11/24/2023 at 7:26 AM, markhollin said:

    In response to the Cumberland Yard plan, Bristol Motor Speedway issued the following statement to the Business Journal:

    “Bristol Motor Speedway’s plan to preserve the historic Fairgrounds Speedway protects important elements of Nashville’s history..."

    LOLOL.  Bristol's proposal is to literally tear down the entire existing  "historic" speedway and build a new one that is twice as large, and of course, not at all historic.  

    • Like 2
    • Thanks 1
  5. On 10/27/2023 at 2:58 AM, markhollin said:

    3800 Charlotte Ave. (4 - 6 stories, 322. units, internal garage) update: exterior nearly complete; sidewalks/curbs installed along Charlotte Ave.

    Looking NW from intersection of Charlotte Ave. and 38th Ave. North:

    3800 Charlotte, Oct 21, 2023, 1.jpeg


    Looking NW from 38th Ave. North, 1/4 block south of I-40:

    3800 Charlotte, Oct 21, 2023, 2.jpeg


    Looking west from 38th Ave. North, 1/4 block north of Charlotte Ave:

    3800 Charlotte, Oct 21, 2023, 3.jpeg


    Looking west from intersection of Charlotte Ave. and 38th Ave. North:

    3800 Charlotte, Oct 21, 2023, 4.jpeg


    Looking north from Charlotte Ave., 1/4 block west of 38th Ave. North:

    3800 Charlotte, Oct 21, 2023, 5.jpeg


    Looking NE from Charlotte Ave., 1/2 block east of 39th Ave. North:

    3800 Charlotte, Oct 21, 2023, 6.jpeg


    Looking north from surface lot at Skyline Manufacturing:

    3800 Charlotte, Oct 21, 2023, 7.jpeg


    Looking NE from surface lot at Skyline Manufacturing:

    3800 Charlotte, Oct 21, 2023, 8.jpeg

    Feels like sky bridges are really making a comeback these days?  

    • Like 2
  6. 22 hours ago, Deepdish53 said:

    image.thumb.png.bf4ee9e7e8d424803d345447deef315c.png

    Just as an FYI - it looks like the Hilton hotel is now accepting reservations starting on February 26. Not sure if I missed any announcements about an opening date, but it seems like it might be late February.

    Weren't they saying 1/1/24 (which always seemed a bit ambitious)  as recently as a month or two ago?  

  7. 38 minutes ago, Bos2Nash said:

    Possibly Riverfront Park? Public Square Park? Cumberland Park (between the pedestrian bridge and KVB)? Hopefully for the road race's sake their leadership has been in touch with Metro and the construction team.

    The logical challenges will be significant on a day-to-day basis just with the sheer amount of construction equipment and workers. The construction is also why the IndyCar series has re-drawn their track to avoid the stadium land. 

    Seems like the marathon folks would need  square footage more like the size of Bicentennial Mall to handle the event size.....

    • Like 1
  8. 3 hours ago, markhollin said:

    A spring 2024 start date is planned and pre-sales have begun for the 194 condos.  These are 4 more units than previously listed.  There will be 116 suite style hotel rooms (4 less than previously announced).  Still 60,000 sq. ft. of office space. 

    Voce will offer one-, two- and three-bedroom condos priced starting in the $500,000s. Three-bedroom units will start at $1.5 million, with the building to offer up to nine penthouses. Owners will have the option to choose between three furnished designs if they opt into the hotel model.

    the Voce rooftop deck will boast a 4,000-square-foot restaurant/bar adjacent to a pool, with the deck to offer views of Nashville’s downtown and Midtown skylines. The Voce restaurant will provide à la carte food and beverage service to both hotel guests and residents.

    Other amenities will include a fitness center, full-time concierge services, golf simulator lounge, bike storage and shop, co-working spaces with conference rooms, designated parking spaces, valet service, package delivery and pick-up center, rideshare portico and 2,500-square-foot outdoor dog park.

    In addition, Voce will include 2,600 square feet of covered terraces placed throughout each of the two office floors, about 11,000 square feet of ground-floor commercial retail space and 700 covered parking spaces.

    More behind the Nashville Post paywall here:

    https://www.nashvillepost.com/business/development/real-estate-notes-spring-start-eyed-for-midtown-tower/article_fd9322a0-6d26-11ee-a4fa-6feafe1f3cff.html

    An additional new rendering:
     

    Screen Shot 2023-10-18 at 8.06.19 AM.png

    700 parking spaces seems really excessive?

    • Like 3
  9. On 10/5/2023 at 8:32 AM, markhollin said:

    Nobles restaurant/bar will be opening a 2nd Nashville location at 2222 Rosa L. Parks Blvd. in the 222RPB complex (formerly Fountain Square). It will be one of the first sit down restaurants in MetroCenter in quite some time. 

    https://www.nashvillepost.com/business/development/east-nashville-restaurant-sports-bar-to-open-second-location/article_1a0a35e8-62fc-11ee-a2e5-6f2f37d7afbf.html
     

    Screen Shot 2023-10-05 at 8.27.51 AM.png

    Screen Shot 2023-10-05 at 8.28.05 AM.png

    Screen Shot 2023-10-05 at 8.28.15 AM.png

    They need to bring back the Fat Tuesday's that was located in one of those pavilions over the water.... 

    • Like 1
    • Thanks 1
  10. 29 minutes ago, Bos2Nash said:

    I think there area any number of reasons why this could've been overlooked. Maybe it was a rush job, maybe it was a third party rendering and there wasn't time for a double check. 

    Always got to keep in mind that artist renderings area almost never going to be 100% correct.

    FWIW,  I see cars trying to take a right here onto 16th from Grand  every few weeks.... Credit to the artist for the hyper realism as far as I'm concerned....

    • Like 1
  11. 21 hours ago, markhollin said:

    Music Row Apts. will now have the moniker Signature Music Row (6 stories, 105 units, ground level retail, internal garage). New rendering available.

    More behind the Nashville Post paywall here:

    https://www.nashvillepost.com/business/development/real-estate-notes-metro-committee-oks-north-gulch-hotel-plan/article_8e06fcda-5643-11ee-aaee-7b35d3ab5499.html

     

    Screen Shot 2023-09-18 at 3.53.33 PM.png

    Still rooting for this one to open  before the hotel on 17th, which has taken about two years longer and has one of the most egregiously long street closures ever. 

    • Like 1
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.